Search Results - C. Timire
- Showing 1 - 1 results of 1
-
1
A feasibility study using time-driven activity-based costing as a management tool for provider cost estimation: lessons from the national TB control program in Zimbabwe in 2018 by J. Chirenda, B. Nhlema Simwaka, C. Sandy, K. Bodnar, S. Corbin, P. Desai, T. Mapako, S. Shamu, C. Timire, E. Antonio, A. Makone, A. Birikorang, T. Mapuranga, M. Ngwenya, T. Masunda, M. Dube, E. Wandwalo, L. Morrison, R. Kaplan
Published 2021Call Number: Loading…Connect to this object online.
Located: Loading…
Book