Scheduling: Algorithms and Applications
This reprint of a Special Issue in the journal Algorithms is dedicated to scheduling algorithms and their various applications. In addition to the Editorial, it contains 12 papers including a survey of assembly and production line design and scheduling under uncertainty. Other topics addressed in th...
Saved in:
Other Authors: | |
---|---|
Format: | Electronic Book Chapter |
Language: | English |
Published: |
Basel
MDPI - Multidisciplinary Digital Publishing Institute
2023
|
Subjects: | |
Online Access: | DOAB: download the publication DOAB: description of the publication |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000naaaa2200000uu 4500 | ||
---|---|---|---|
001 | doab_20_500_12854_112513 | ||
005 | 20230808 | ||
003 | oapen | ||
006 | m o d | ||
007 | cr|mn|---annan | ||
008 | 20230808s2023 xx |||||o ||| 0|eng d | ||
020 | |a books978-3-0365-8277-1 | ||
020 | |a 9783036582764 | ||
020 | |a 9783036582771 | ||
040 | |a oapen |c oapen | ||
024 | 7 | |a 10.3390/books978-3-0365-8277-1 |c doi | |
041 | 0 | |a eng | |
042 | |a dc | ||
072 | 7 | |a KNTX |2 bicssc | |
072 | 7 | |a UY |2 bicssc | |
100 | 1 | |a Werner, Frank |4 edt | |
700 | 1 | |a Werner, Frank |4 oth | |
245 | 1 | 0 | |a Scheduling: Algorithms and Applications |
260 | |a Basel |b MDPI - Multidisciplinary Digital Publishing Institute |c 2023 | ||
300 | |a 1 electronic resource (276 p.) | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
506 | 0 | |a Open Access |2 star |f Unrestricted online access | |
520 | |a This reprint of a Special Issue in the journal Algorithms is dedicated to scheduling algorithms and their various applications. In addition to the Editorial, it contains 12 papers including a survey of assembly and production line design and scheduling under uncertainty. Other topics addressed in this reprint are the energy management of power systems, cost scheduling for financial data supply chains, staff scheduling in the construction industry, various assignment problems, single-lane roundabouts, robotic arm-based batching systems with conveyor belts, as well as single-machine and flow-shop scheduling problems. | ||
540 | |a Creative Commons |f https://creativecommons.org/licenses/by/4.0/ |2 cc |4 https://creativecommons.org/licenses/by/4.0/ | ||
546 | |a English | ||
650 | 7 | |a Information technology industries |2 bicssc | |
650 | 7 | |a Computer science |2 bicssc | |
653 | |a batteries | ||
653 | |a photovoltaic cell | ||
653 | |a fuel cell | ||
653 | |a super capacitor | ||
653 | |a state-of-charge | ||
653 | |a energy management | ||
653 | |a permutation flow shop | ||
653 | |a simheuristic | ||
653 | |a multicriteria | ||
653 | |a PAES | ||
653 | |a GRASP | ||
653 | |a AHP | ||
653 | |a financial data | ||
653 | |a supply chain management | ||
653 | |a data batching | ||
653 | |a scheduling | ||
653 | |a batching cost | ||
653 | |a parallel processing | ||
653 | |a optimization | ||
653 | |a multi-processing commitment | ||
653 | |a hybrid mixed-flow workshop | ||
653 | |a hybrid particle swarm algorithm | ||
653 | |a algorithm parallelization | ||
653 | |a computational efficiency | ||
653 | |a construction industry | ||
653 | |a irregular employees | ||
653 | |a staff scheduling | ||
653 | |a mathematical model | ||
653 | |a business level strategies | ||
653 | |a decision-making | ||
653 | |a organizational effectiveness | ||
653 | |a UPC | ||
653 | |a distributed computing platform | ||
653 | |a uniform job | ||
653 | |a static assignment | ||
653 | |a linear equations | ||
653 | |a assignment problem | ||
653 | |a traveling salesman problem | ||
653 | |a vehicle routing problem | ||
653 | |a flow shop scheduling problem | ||
653 | |a GAMS, genetic algorithm | ||
653 | |a constraint programming | ||
653 | |a heuristics | ||
653 | |a local search | ||
653 | |a survey | ||
653 | |a assembly line | ||
653 | |a optimal line balance | ||
653 | |a uncertainty | ||
653 | |a stability analysis | ||
653 | |a suburban roundabout design | ||
653 | |a swept path analysis | ||
653 | |a geometric parameters | ||
653 | |a performance estimation | ||
653 | |a capacity assessment | ||
653 | |a robotic arm-based batching systems | ||
653 | |a scheduling robotic arms | ||
653 | |a robotic task-sequencing problem | ||
653 | |a real-time decision making | ||
653 | |a give-away minimization | ||
653 | |a SHOA | ||
653 | |a hybrid algorithm | ||
653 | |a metaheuristics | ||
653 | |a spotted hyena optimizer | ||
653 | |a genetic algorithm | ||
653 | |a uniform crossover | ||
653 | |a OR library | ||
653 | |a n/a | ||
856 | 4 | 0 | |a www.oapen.org |u https://mdpi.com/books/pdfview/book/7632 |7 0 |z DOAB: download the publication |
856 | 4 | 0 | |a www.oapen.org |u https://directory.doabooks.org/handle/20.500.12854/112513 |7 0 |z DOAB: description of the publication |