Discrete time analysis of batch processes in material flow systems
Scope of this work is the development of appropriate models for the evaluation of batch processes in material flow systems. The presented analytical methods support the long range planning in an early planning stage, in which capacities are determined to minimize the facility costs under the conditi...
Saved in:
Main Author: | |
---|---|
Format: | Electronic Book Chapter |
Language: | English |
Published: |
KIT Scientific Publishing
2007
|
Series: | Wissenschaftliche Berichte des Institutes für Fördertechnik und Logistiksysteme der Universität Karlsruhe (TH)
|
Subjects: | |
Online Access: | DOAB: download the publication DOAB: description of the publication |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000naaaa2200000uu 4500 | ||
---|---|---|---|
001 | doab_20_500_12854_45250 | ||
005 | 20210211 | ||
003 | oapen | ||
006 | m o d | ||
007 | cr|mn|---annan | ||
008 | 20210211s2007 xx |||||o ||| 0|eng d | ||
020 | |a KSP/1000006694 | ||
020 | |a 9783866441675 | ||
040 | |a oapen |c oapen | ||
024 | 7 | |a 10.5445/KSP/1000006694 |c doi | |
041 | 0 | |a eng | |
042 | |a dc | ||
072 | 7 | |a TB |2 bicssc | |
100 | 1 | |a Schleyer, Marc |4 auth | |
245 | 1 | 0 | |a Discrete time analysis of batch processes in material flow systems |
260 | |b KIT Scientific Publishing |c 2007 | ||
300 | |a 1 electronic resource (XIV, 137 p. p.) | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
490 | 1 | |a Wissenschaftliche Berichte des Institutes für Fördertechnik und Logistiksysteme der Universität Karlsruhe (TH) | |
506 | 0 | |a Open Access |2 star |f Unrestricted online access | |
520 | |a Scope of this work is the development of appropriate models for the evaluation of batch processes in material flow systems. The presented analytical methods support the long range planning in an early planning stage, in which capacities are determined to minimize the facility costs under the condition of cycle time targets. | ||
540 | |a Creative Commons |f https://creativecommons.org/licenses/by-nc-nd/4.0/ |2 cc |4 https://creativecommons.org/licenses/by-nc-nd/4.0/ | ||
546 | |a English | ||
650 | 7 | |a Technology: general issues |2 bicssc | |
653 | |a Performance evaluation | ||
653 | |a Batch processes | ||
653 | |a Discrete time | ||
653 | |a Queueing theory | ||
653 | |a Material flow planning | ||
653 | |a Logistics | ||
856 | 4 | 0 | |a www.oapen.org |u https://www.ksp.kit.edu/9783866441675 |7 0 |z DOAB: download the publication |
856 | 4 | 0 | |a www.oapen.org |u https://directory.doabooks.org/handle/20.500.12854/45250 |7 0 |z DOAB: description of the publication |