Cubipod Manual 2016

Cubipod¿ Manual 2016 provides basic criteria for the preliminary design of mound breakwaters protected with single- or double-layer Cubipod¿ armors. Economic, logistic and environmental factors are analyzed to guide the designers in the preliminary design phase of a breakwater.The economic cost of a...

Full description

Saved in:
Bibliographic Details
Main Author: Medina Folgado, Josep Ramon (auth)
Other Authors: Gómez Martín, Mª Esther (auth)
Format: Electronic Book Chapter
Language:English
Published: Valencia Universitat Politècnica de València Editorial 2016
Series:UPV[Scientia]
Subjects:
Online Access:DOAB: download the publication
DOAB: description of the publication
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000naaaa2200000uu 4500
001 doab_20_500_12854_78470
005 20220221
003 oapen
006 m o d
007 cr|mn|---annan
008 20220221s2016 xx |||||o ||| 0|eng d
020 |a 978-84-9048-538-5 
040 |a oapen  |c oapen 
041 0 |a eng 
042 |a dc 
072 7 |a TNFD  |2 bicssc 
100 1 |a Medina Folgado, Josep Ramon  |4 auth 
700 1 |a Gómez Martín, Mª Esther  |4 auth 
245 1 0 |a Cubipod Manual 2016 
260 |a Valencia  |b Universitat Politècnica de València Editorial  |c 2016 
300 |a 1 electronic resource (160 p.) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a UPV[Scientia] 
506 0 |a Open Access  |2 star  |f Unrestricted online access 
520 |a Cubipod¿ Manual 2016 provides basic criteria for the preliminary design of mound breakwaters protected with single- or double-layer Cubipod¿ armors. Economic, logistic and environmental factors are analyzed to guide the designers in the preliminary design phase of a breakwater.The economic cost of a large mound breakwater usually depends on the geometry of the concrete unit used for the armor layer. Each geometry (cube, Cubipod¿, Tetrapod, etc.) and placement pattern (random, specific, ordered, etc.) can be used for single-layer armoring, double-layer armoring or both.Each armor design alternative, with a different packing density, has a different hydraulic performance and logistic constraints. Although some general rules and comments are applicable to other armor units,Cubipod¿ Manual 2016 is focused on the use of Cubipod¿ units in conventional mound breakwaters. 
540 |a Creative Commons  |f https://creativecommons.org/licenses/by-nc-sa/4.0/  |2 cc  |4 https://creativecommons.org/licenses/by-nc-sa/4.0/ 
546 |a English 
650 7 |a Dams & reservoirs  |2 bicssc 
856 4 0 |a www.oapen.org  |u https://www.lalibreria.upv.es/portalEd/UpvGEStore/products/p_6350-1-1  |7 0  |z DOAB: download the publication 
856 4 0 |a www.oapen.org  |u https://directory.doabooks.org/handle/20.500.12854/78470  |7 0  |z DOAB: description of the publication