Wirksamkeit der Taktplanung aus Perspektive des Bauherrn am Beispiel von Produktionsimmobilien in der Automobilindustrie

This work analyses the time effect that occurs due to the use of takt planning and takt control during the construction process from the perspective of the client. At first the historical courses of takt planning and takt control (TPTC) are aggregated. For an appropriate handling of the time reducin...

Full description

Saved in:
Bibliographic Details
Main Author: Dlouhy, Janosch (auth)
Format: Electronic Book Chapter
Published: KIT Scientific Publishing 2022
Series:Karlsruher Reihe Technologie und Management im Baubetrieb
Subjects:
Online Access:DOAB: download the publication
DOAB: description of the publication
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000naaaa2200000uu 4500
001 doab_20_500_12854_81709
005 20220517
003 oapen
006 m o d
007 cr|mn|---annan
008 20220517s2022 xx |||||o ||| 0|deu d
020 |a KSP/1000140496 
040 |a oapen  |c oapen 
024 7 |a 10.5445/KSP/1000140496  |c doi 
041 0 |a deu 
042 |a dc 
072 7 |a TN  |2 bicssc 
100 1 |a Dlouhy, Janosch  |4 auth 
245 1 0 |a Wirksamkeit der Taktplanung aus Perspektive des Bauherrn am Beispiel von Produktionsimmobilien in der Automobilindustrie 
260 |b KIT Scientific Publishing  |c 2022 
300 |a 1 electronic resource (250 p.) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a Karlsruher Reihe Technologie und Management im Baubetrieb 
506 0 |a Open Access  |2 star  |f Unrestricted online access 
520 |a This work analyses the time effect that occurs due to the use of takt planning and takt control during the construction process from the perspective of the client. At first the historical courses of takt planning and takt control (TPTC) are aggregated. For an appropriate handling of the time reducing mechanisms three parameters are derived. The findings of this work are summarized into a recommendation for the use of takt planning for owners. 
540 |a Creative Commons  |f https://creativecommons.org/licenses/by-sa/4.0/  |2 cc  |4 https://creativecommons.org/licenses/by-sa/4.0/ 
546 |a German 
650 7 |a Civil engineering, surveying & building  |2 bicssc 
653 |a Bau; Takt; Taktplanung; Bauherr; Industriebau; Construction; Taktplanning; Owner 
856 4 0 |a www.oapen.org  |u https://library.oapen.org/bitstream/20.500.12657/54463/1/wirksamkeit-der-taktplanung-aus-perspektive-des-bauherrn-am-beispiel-von-produktionsimmobilien-in-der-automobilindustrie.pdf  |7 0  |z DOAB: download the publication 
856 4 0 |a www.oapen.org  |u https://directory.doabooks.org/handle/20.500.12854/81709  |7 0  |z DOAB: description of the publication