Technology and Management Applied in Construction Engineering Projects
This book focuses on fundamental and applied research on construction project management. It presents research papers and practice-oriented papers. The execution of construction projects is specific and particularly difficult because each implementation is a unique, complex, and dynamic process that...
Saved in:
Other Authors: | , , |
---|---|
Format: | Electronic Book Chapter |
Language: | English |
Published: |
Basel
MDPI - Multidisciplinary Digital Publishing Institute
2022
|
Subjects: | |
Online Access: | DOAB: download the publication DOAB: description of the publication |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000naaaa2200000uu 4500 | ||
---|---|---|---|
001 | doab_20_500_12854_95785 | ||
005 | 20230105 | ||
003 | oapen | ||
006 | m o d | ||
007 | cr|mn|---annan | ||
008 | 20230105s2022 xx |||||o ||| 0|eng d | ||
020 | |a books978-3-0365-6040-3 | ||
020 | |a 9783036560397 | ||
020 | |a 9783036560403 | ||
040 | |a oapen |c oapen | ||
024 | 7 | |a 10.3390/books978-3-0365-6040-3 |c doi | |
041 | 0 | |a eng | |
042 | |a dc | ||
072 | 7 | |a TB |2 bicssc | |
072 | 7 | |a TBX |2 bicssc | |
100 | 1 | |a Szóstak, Mariusz |4 edt | |
700 | 1 | |a Sawicki, Marek |4 edt | |
700 | 1 | |a Konior, Jarosław |4 edt | |
700 | 1 | |a Szóstak, Mariusz |4 oth | |
700 | 1 | |a Sawicki, Marek |4 oth | |
700 | 1 | |a Konior, Jarosław |4 oth | |
245 | 1 | 0 | |a Technology and Management Applied in Construction Engineering Projects |
260 | |a Basel |b MDPI - Multidisciplinary Digital Publishing Institute |c 2022 | ||
300 | |a 1 electronic resource (314 p.) | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
506 | 0 | |a Open Access |2 star |f Unrestricted online access | |
520 | |a This book focuses on fundamental and applied research on construction project management. It presents research papers and practice-oriented papers. The execution of construction projects is specific and particularly difficult because each implementation is a unique, complex, and dynamic process that consists of several or more subprocesses that are related to each other, in which various aspects of the investment process participate. Therefore, there is still a vital need to study, research, and conclude the engineering technology and management applied in construction projects. This book present unanimous research approach is a result of many years of studies, conducted by 35 well experienced authors. The common subject of research concerns the development of methods and tools for modeling multi-criteria processes in construction engineering. | ||
540 | |a Creative Commons |f https://creativecommons.org/licenses/by/4.0/ |2 cc |4 https://creativecommons.org/licenses/by/4.0/ | ||
546 | |a English | ||
650 | 7 | |a Technology: general issues |2 bicssc | |
650 | 7 | |a History of engineering & technology |2 bicssc | |
653 | |a earned value method-EVM | ||
653 | |a time variances | ||
653 | |a cost variances | ||
653 | |a schedule | ||
653 | |a cadastre | ||
653 | |a land surveyor | ||
653 | |a construction surveying | ||
653 | |a building layout | ||
653 | |a polar coordinates | ||
653 | |a stake-out methods | ||
653 | |a total station | ||
653 | |a construction reports | ||
653 | |a construction contracts | ||
653 | |a natural language processing | ||
653 | |a machine learning | ||
653 | |a simulation modeling | ||
653 | |a bridge expansion and contraction installation (BECI) | ||
653 | |a decision making (DM) | ||
653 | |a technical condition assessment | ||
653 | |a analytic hierarchy process (AHP) | ||
653 | |a whale optimization algorithm | ||
653 | |a Tent chaotic mapping | ||
653 | |a Lévy flight | ||
653 | |a resilience | ||
653 | |a baseline schedule | ||
653 | |a uncertainty | ||
653 | |a taxonomy | ||
653 | |a construction project | ||
653 | |a PERT | ||
653 | |a theory of constraint (TOC) | ||
653 | |a drum-buffer-rope (DBR) | ||
653 | |a construction schedule | ||
653 | |a monitoring progress | ||
653 | |a construction phase | ||
653 | |a automated monitoring | ||
653 | |a digital tools | ||
653 | |a as-built | ||
653 | |a as-planned | ||
653 | |a efficiency | ||
653 | |a risk | ||
653 | |a randomization | ||
653 | |a association analysis | ||
653 | |a tabu search | ||
653 | |a delay | ||
653 | |a time schedules | ||
653 | |a project risk | ||
653 | |a construction project management | ||
653 | |a Time-at-Risk (TaR) | ||
653 | |a investment-construction process model | ||
653 | |a Monte Carlo simulation | ||
653 | |a decision-making process | ||
653 | |a decision modelling in construction activities | ||
653 | |a decisions in civil engineering | ||
653 | |a liquid cooling system | ||
653 | |a flow calibration | ||
653 | |a differential pressure | ||
653 | |a experimental method | ||
653 | |a aircraft | ||
653 | |a building information modelling (BIM) | ||
653 | |a automatisation | ||
653 | |a facilities design | ||
653 | |a domestic plumbing and sanitation | ||
653 | |a management | ||
653 | |a project cost | ||
653 | |a investment schedule | ||
653 | |a risk mitigation | ||
653 | |a randomness | ||
653 | |a fuzziness | ||
653 | |a health and safety control | ||
856 | 4 | 0 | |a www.oapen.org |u https://mdpi.com/books/pdfview/book/6441 |7 0 |z DOAB: download the publication |
856 | 4 | 0 | |a www.oapen.org |u https://directory.doabooks.org/handle/20.500.12854/95785 |7 0 |z DOAB: description of the publication |