Stakeholder Participation in the Strategic Plan Developing Process: A Survey from the Hospital Setting

Background: One of the most important requirements for developing a strategic plan is the effective participation of various stakeholders in plan formulation. The aim of present study was the evaluation of stakeholder participation in the strategic plan developing process in selected hospitals in Te...

Full description

Saved in:
Bibliographic Details
Main Authors: Mehdi Jafari (Author), Shahram Tofighi (Author), Jamil Sadeghifar (Author), Shabnam Ghasemyani (Author), Mohammad Roshani (Author), Zahra Toulideh (Author)
Format: Book
Published: Shahid Sadoughi University of Medical Sciences, 2021-10-01T00:00:00Z.
Subjects:
Online Access:Connect to this object online.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 doaj_148e5f60251e4779ad6f13ba7f9c0ba6
042 |a dc 
100 1 0 |a Mehdi Jafari  |e author 
700 1 0 |a Shahram Tofighi  |e author 
700 1 0 |a Jamil Sadeghifar  |e author 
700 1 0 |a Shabnam Ghasemyani  |e author 
700 1 0 |a Mohammad Roshani  |e author 
700 1 0 |a Zahra Toulideh  |e author 
245 0 0 |a Stakeholder Participation in the Strategic Plan Developing Process: A Survey from the Hospital Setting 
260 |b Shahid Sadoughi University of Medical Sciences,   |c 2021-10-01T00:00:00Z. 
500 |a 2538-5070 
500 |a 2538-4716 
520 |a Background: One of the most important requirements for developing a strategic plan is the effective participation of various stakeholders in plan formulation. The aim of present study was the evaluation of stakeholder participation in the strategic plan developing process in selected hospitals in Tehran. Methods: This is a cross-sectional study. This study was conducted in selected hospitals at Tehran in 2015. The data collection tool was a researcher made questionnaire consisting of 3 parts: demographic data, stakeholder participation, and attention to the strategic planchr('39')s components. The validity of questionnaire was confirmed by experts, and its reliability was confirmed by Cronbachchr('39')s Alpha test (α = 0.8). The SPSS18 software was used for data analysis. Descriptive statistics (means, standard deviations, and percentages) were calculated. Results: The findings showed that the highest (42.9) and lowest (34.7) mean score of stakeholder participation in the strategic planning formulation was related to "provision required information for planning" and" presentation of gathering and documentation of the plan, "respectively. Hospital managers (91 percent) had the highest involvement, and external stakeholders had the least participation (1.7 percent) in the strategic planning formulation. The least attention is devoted to evaluating the proposed strategieschr('39') feasibility, identifying competitive and strategic differentiation, and identifying stakeholderschr('39') concerns and needs, respectively. Conclusion: Stakeholderschr('39') involvement in the formulation of the hospitalschr('39') strategic plan was not favorable, and hospitals were unable or unwilling to benefit from their participation in the program. 
546 |a EN 
690 |a strategic plan 
690 |a stakeholders 
690 |a hospital 
690 |a iran 
690 |a Medicine 
690 |a R 
690 |a Public aspects of medicine 
690 |a RA1-1270 
655 7 |a article  |2 local 
786 0 |n Journal of Evidence Based Health Policy, Management & Economics, Vol 5, Iss 3, Pp 185-193 (2021) 
787 0 |n http://jebhpme.ssu.ac.ir/article-1-336-en.html 
787 0 |n https://doaj.org/toc/2538-5070 
787 0 |n https://doaj.org/toc/2538-4716 
856 4 1 |u https://doaj.org/article/148e5f60251e4779ad6f13ba7f9c0ba6  |z Connect to this object online.