Development of the KOSHA Proficiency Testing Scheme on Asbestos Analysis in Korea

This commentary presents the regulatory backgrounds and development of the national proficiency testing (PT) scheme on asbestos analysis in the Republic of Korea. Since 2009, under the amended Occupational Safety and Health Act, the survey of asbestos in buildings and clearance test of asbestos remo...

Full description

Saved in:
Bibliographic Details
Main Authors: Jiwoon Kwon (Author), Konghwa Jang (Author), Eunsong Hwang (Author), Ki-Woong Kim (Author)
Format: Book
Published: Elsevier, 2017-09-01T00:00:00Z.
Subjects:
Online Access:Connect to this object online.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 doaj_8b1b54ac14914f4e867d0fffa1c5f3f4
042 |a dc 
100 1 0 |a Jiwoon Kwon  |e author 
700 1 0 |a Konghwa Jang  |e author 
700 1 0 |a Eunsong Hwang  |e author 
700 1 0 |a Ki-Woong Kim  |e author 
245 0 0 |a Development of the KOSHA Proficiency Testing Scheme on Asbestos Analysis in Korea 
260 |b Elsevier,   |c 2017-09-01T00:00:00Z. 
500 |a 2093-7911 
500 |a 10.1016/j.shaw.2017.08.001 
520 |a This commentary presents the regulatory backgrounds and development of the national proficiency testing (PT) scheme on asbestos analysis in the Republic of Korea. Since 2009, under the amended Occupational Safety and Health Act, the survey of asbestos in buildings and clearance test of asbestos removal works have been mandated to be carried out by the laboratories designated by the Ministry of Employment and Labor (MOEL) in the Republic of Korea. To assess the performance of asbestos laboratories, a PT scheme on asbestos analysis was launched by the Korea Occupational Safety and Health Agency (KOSHA) on behalf of the MOEL in 2007. Participating laboratories are evaluated once a year for fiber counting and bulk asbestos analysis by phase contrast microscopy and polarized light microscopy, respectively. Currently, the number of laboratory enrollments is > 200, and the percentage of passed laboratories is > 90. The current status and several significant changes in operation, sample preparations, and statistics of assigning the reference values of the KOSHA PT scheme on asbestos analysis are presented. Critical retrospect based on the experiences of operating the KOSHA PT scheme suggests considerations for developing a new national PT scheme for asbestos analysis. 
546 |a EN 
690 |a asbestos 
690 |a bulk asbestos analysis 
690 |a fiber counting 
690 |a the Republic of Korea 
690 |a proficiency testing 
690 |a Public aspects of medicine 
690 |a RA1-1270 
655 7 |a article  |2 local 
786 0 |n Safety and Health at Work, Vol 8, Iss 3, Pp 318-321 (2017) 
787 0 |n http://www.sciencedirect.com/science/article/pii/S209379111730313X 
787 0 |n https://doaj.org/toc/2093-7911 
856 4 1 |u https://doaj.org/article/8b1b54ac14914f4e867d0fffa1c5f3f4  |z Connect to this object online.