AFFECT OF BAR SWIMMING MARATHON ON THE CONSTRUCTION OF AN INDOOR SWIMMING POOL
Since 1980, when Bar Swimming Marathon was first started as a sports and to- urist event of at Montenegrin seaside organized during the summer tourist season, the idea to build an indoor swimming pool has been reconsidered. Besides the beneficial effects that the marathon has on the town of Bar, it...
Saved in:
Main Authors: | , |
---|---|
Format: | Book |
Published: |
Montenegrin Sports Academy and Faculty for Sport and Physical Education,
2009-11-01T00:00:00Z.
|
Subjects: | |
Online Access: | Connect to this object online. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Since 1980, when Bar Swimming Marathon was first started as a sports and to- urist event of at Montenegrin seaside organized during the summer tourist season, the idea to build an indoor swimming pool has been reconsidered. Besides the beneficial effects that the marathon has on the town of Bar, it has directly affected the decision to build the swimming pool. After such a long time, on 30th August 2009, the day of the 30th jubilee of the swimming marathon, "The Shores of Montenegro - Bar, the construction of the swimming pool is expected to begin |
---|---|
Item Description: | 1451-7485 2337-0351 |