Capacity adequacy in the Nordic electricity market
An increasing share of intermittent renewable generation and reduced profitability of conventional power generation has led to a growing concern for capacity adequacy in the Nordic electricity market (Nord Pool market area). It does not make sense to assess capacity adequacy for each country separat...
Saved in:
Main Author: | |
---|---|
Format: | Electronic Book Chapter |
Language: | English |
Published: |
Nordic Council of Ministers
2015
|
Series: | TemaNord
|
Subjects: | |
Online Access: | OAPEN Library: download the publication OAPEN Library: description of the publication |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | An increasing share of intermittent renewable generation and reduced profitability of conventional power generation has led to a growing concern for capacity adequacy in the Nordic electricity market (Nord Pool market area). It does not make sense to assess capacity adequacy for each country separately in the Nord Pool market area as it is highly integrated in terms of both interconnector capacity and market integration. Capacity challenges are rarely isolated to one country or bidding zone. This report analyses what market solutions may be used to manage capacity adequacy in the Nord Pool market area, and how an efficient transition to adequate market solutions could be achieved. The main analysis reveals several measures that would strengthen price formation and cost recovery in the Nord Pool market area, although in general, the market is already highly liquid and well-functioning. |
---|---|
Physical Description: | 1 electronic resource (143 p.) |
ISBN: | TN2015-560 9789289342858 |
Access: | Open Access |