Wirksamkeit der Taktplanung aus Perspektive des Bauherrn am Beispiel von Produktionsimmobilien in der Automobilindustrie
This work analyses the time effect that occurs due to the use of takt planning and takt control during the construction process from the perspective of the client. At first the historical courses of takt planning and takt control (TPTC) are aggregated. For an appropriate handling of the time reducin...
Kaydedildi:
Yazar: | Dlouhy, Janosch (auth) |
---|---|
Materyal Türü: | Elektronik Kitap Bölümü |
Baskı/Yayın Bilgisi: |
KIT Scientific Publishing
2022
|
Seri Bilgileri: | Karlsruher Reihe Technologie und Management im Baubetrieb
7 |
Konular: | |
Online Erişim: | OAPEN Library: download the publication OAPEN Library: description of the publication |
Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Wirksamkeit der Taktplanung aus Perspektive des Bauherrn am Beispiel von Produktionsimmobilien in der Automobilindustrie
Yazar:: Dlouhy, Janosch
Baskı/Yayın Bilgisi: (2022) -
Daten- und termingesteuerte Entscheidungsmethodik der Fabrikplanung unter Berücksichtigung der Produktentstehung
Yazar:: Loos, Manuel Norbert
Baskı/Yayın Bilgisi: (2013) -
Untersuchungen zum Arbeitsfluss in getakteten Bauproduktionssystemen aus Perspektive von Generalunternehmern
Yazar:: Binninger, Marco
Baskı/Yayın Bilgisi: (2022) -
Untersuchungen zum Arbeitsfluss in getakteten Bauproduktionssystemen aus Perspektive von Generalunternehmern
Yazar:: Binninger, Marco
Baskı/Yayın Bilgisi: (2022) -
Integrierte Planungsmethodik für die Presswerkneutypplanung in der Automobilindustrie
Yazar:: Gloßner, Markus
Baskı/Yayın Bilgisi: (2007)