Study on Innovative Scenario for Transportation and Lowering of 18000 Ton Caisson for Persian Gulf Bridge
<p>This paper aims to provide an innovative scenario for transportation and lowering installation of heavy caissons of 18000 tons for Persian Gulf Bridge. The project is supposed to be carried on in Bohal port from Hormozgan to Qeshm Island in Iran. There is a heated controversy over the suita...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Published: |
Journal of Civil Engineering and Environmental Sciences - Peertechz Publications,
2015-11-06.
|
Subjects: | |
Online Access: | Connect to this object online. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | <p>This paper aims to provide an innovative scenario for transportation and lowering installation of heavy caissons of 18000 tons for Persian Gulf Bridge. The project is supposed to be carried on in Bohal port from Hormozgan to Qeshm Island in Iran. There is a heated controversy over the suitable scenario to do the operation safely and lower the caissons correctly under sea to position them on their exact location. Due to this a comprehensive study is need to take heed all aspect of the operation. The study will include a discussion on both sides of installation and transportation and give a deep-rooted insight over the excuvation plane for the operation.</p> |
---|---|
DOI: | 10.17352/2455-488X.000006 |