An application of lean concept to structural steel fabrication process : a case study of steel box girder fabrication for a bridge project
Thesis (M.Eng.)--Chulalongkorn University, 2011
Saved in:
Main Author: | Worawat Sriudom (Author) |
---|---|
Other Authors: | Veerasak Likhitruangsilp (Contributor), Chulalongkorn University. Faculty of Engineering (Contributor) |
Format: | Book |
Published: |
Chulalongkorn University,
2013-10-11T01:35:53Z.
|
Subjects: | |
Online Access: | http://cuir.car.chula.ac.th/handle/123456789/36109 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS PELAKSANAAN PEKERJAAN ERECTION STEEL BOX GIRDER MENGGUNAKAN METODE TANDEM CRANE DAN METODE LAUNCHER GIRDER DARI SEGI WAKTU DAN BIAYA : Studi Kasus : Pekerjaan Steel Box Girder pada Pembangunan Jalan Tol Jakarta-Cikampek II Elevated
by: Ghina Avia Telia Hadisaputra, -
Published: (2019) -
Fabricating Modern Societies: Education, Bodies, and Minds in the Age of Steel
Published: (2019) -
Fabricating Modern Societies: Education, Bodies, and Minds in the Age of Steel
Published: (2019) -
Fundamentals for the Dimensioning and Optimization of Prestressed Segmented Girders for Application in Bridge Crane Systems
by: Oellerich, Jan
Published: (2022) -
Fundamentals for the Dimensioning and Optimization of Prestressed Segmented Girders for Application in Bridge Crane Systems
by: Oellerich, Jan
Published: (2022)