A descriptive study on the usage of performance measure according to balanced scorecard (BSC) perspectives within the Malaysian electrical & electronic sector / Amri Mohamad, Tuan Rosli Tuan Hassan dan Yusserie Zainuddin
This research presents the use of multiple measures of performance in the electrical and electronic (E&E) manufacturing firms in Malaysia. The objective of this study is to investigate the usage of multidimensional performance measure which includes financial and nonfinancial indicators within t...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Published: |
Universiti Teknologi Mara Cawangan Kelantan,
2016-11.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000 am a22000003u 4500 | ||
---|---|---|---|
001 | repouitm_29293 | ||
042 | |a dc | ||
100 | 1 | 0 | |a Mohamad, Amri |e author |
700 | 1 | 0 | |a Tuan Hassan, Tuan Rosli |e author |
700 | 1 | 0 | |a Zainuddin, Yusserie |e author |
245 | 0 | 0 | |a A descriptive study on the usage of performance measure according to balanced scorecard (BSC) perspectives within the Malaysian electrical & electronic sector / Amri Mohamad, Tuan Rosli Tuan Hassan dan Yusserie Zainuddin |
260 | |b Universiti Teknologi Mara Cawangan Kelantan, |c 2016-11. | ||
500 | |a https://ir.uitm.edu.my/id/eprint/29293/1/29353.pdf | ||
520 | |a This research presents the use of multiple measures of performance in the electrical and electronic (E&E) manufacturing firms in Malaysia. The objective of this study is to investigate the usage of multidimensional performance measure which includes financial and nonfinancial indicators within the Malaysian E&E manufacturing firms' performance. Basically, the theoretical gaps concentrated on the issue of focusing solely on financial measurements to measure the firm's performance. This is to investigate the usage of performance measure according to the Balanced Scorecards (BSC) perspectives within the E&E manufacturers in Malaysia. | ||
546 | |a en | ||
690 | |a Balanced scorecard (Management) | ||
690 | |a HG Finance | ||
690 | |a Financial management. Business finance. Corporation finance | ||
655 | 7 | |a Article |2 local | |
655 | 7 | |a PeerReviewed |2 local | |
787 | 0 | |n https://ir.uitm.edu.my/id/eprint/29293/ | |
787 | 0 | |n http://jcssr.com.my/ | |
856 | 4 | 1 | |u https://ir.uitm.edu.my/id/eprint/29293/ |z Link Metadata |