Balanced scorecard implementation within a Malaysian government-linked company / Norlaila Md Zin ...[et al.]

This study attempts to gain insights on the implementation of Balanced Scorecard (BSC) within a Malaysian Government-linked Company (GLC) in line with the government-led GLC Transformation Programme (GLCTP). The GLCTP was introduced by the Malaysian Government to steer the GLCs in becoming regional...

Full description

Saved in:
Bibliographic Details
Main Authors: Md Zin, Norlaila (Author), Sulaiman, Suzana (Author), Ramli, Aliza (Author), Nawawi, Anuar (Author)
Format: Book
Published: Universiti Teknologi MARA Cawangan Selangor, 2012-06.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_29698
042 |a dc 
100 1 0 |a Md Zin, Norlaila  |e author 
700 1 0 |a Sulaiman, Suzana  |e author 
700 1 0 |a Ramli, Aliza  |e author 
700 1 0 |a Nawawi, Anuar  |e author 
245 0 0 |a Balanced scorecard implementation within a Malaysian government-linked company / Norlaila Md Zin ...[et al.] 
260 |b Universiti Teknologi MARA Cawangan Selangor,   |c 2012-06. 
500 |a https://ir.uitm.edu.my/id/eprint/29698/1/AJ_NORLAILA%20MD%20ZIN%20APMAJ%20B%2012.pdf 
520 |a This study attempts to gain insights on the implementation of Balanced Scorecard (BSC) within a Malaysian Government-linked Company (GLC) in line with the government-led GLC Transformation Programme (GLCTP). The GLCTP was introduced by the Malaysian Government to steer the GLCs in becoming regional and international players. The study employs a case study method involving semi-structured interviews, review of documentation and website information. Consistent with the literature, our findings revealed that the case firm indeed implements BSC that has been tailored to its own needs. In this paper, we also suggest that four key factors: top management commitment, information technology (IT), communication, and organisational culture are critically required for GLC firms to successfully implement the BSC. 
546 |a en 
690 |a Management. Industrial Management 
690 |a Organizational effectiveness. Performance measurement 
690 |a Balanced scorecard (Management) 
655 7 |a Article  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/29698/ 
787 0 |n http://arionline.uitm.edu.my/ojs/index.php/APMAJ/article/view/56 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/29698/  |z Link Metadata