Construction waste management: Level of practice of contractors / Wan Zukri Wan Abdullah and Ahmad Ruslan Mohd Ridzuan

Construction wastes have become a major environmental problem not only in Malaysia but also throughout the world. Tonnes of demolition and construction wastes are produced daily. While most wastes are destined to landfill areas, some of them are disposed of and dumped illegally in private lands. Hen...

Full description

Saved in:
Bibliographic Details
Main Authors: Wan Abdullah, Wan Zukri (Author), Mohd Ridzuan, Ahmad Ruslan (Author)
Format: Book
Published: Universiti Teknologi MARA Cawangan Pahang, 2008.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_32988
042 |a dc 
100 1 0 |a Wan Abdullah, Wan Zukri  |e author 
700 1 0 |a Mohd Ridzuan, Ahmad Ruslan  |e author 
245 0 0 |a Construction waste management: Level of practice of contractors / Wan Zukri Wan Abdullah and Ahmad Ruslan Mohd Ridzuan 
260 |b Universiti Teknologi MARA Cawangan Pahang,   |c 2008. 
500 |a https://ir.uitm.edu.my/id/eprint/32988/1/32988.PDF 
520 |a Construction wastes have become a major environmental problem not only in Malaysia but also throughout the world. Tonnes of demolition and construction wastes are produced daily. While most wastes are destined to landfill areas, some of them are disposed of and dumped illegally in private lands. Hence, if the production of wastes is not controlled and managed properly, Malaysia will eventually face major environmental problems as a result of rapid dwindling of available dumping and landfill areas. Controlling and managing construction wastes are becoming more and more eminent and important to healthier living environment of the future generation. Construction sites wastes should be managed and minimised to mitigate negative effects to the environment. This paper will look on the basic procedure of construction waste management that has been practised by the contractors. Finally, this paper will proposed basic waste management guidelines as a basic preparation that consist of three (3) main factors; basic preparation of Waste Management Plan (WMP), estimating of construction waste, and sorting or separation techniques of building waste 
546 |a en 
690 |a Enviromental management 
690 |a Malaysia 
690 |a Management of the construction site. Superintendence of building construction 
655 7 |a Conference or Workshop Item  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/32988/ 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/32988/  |z Link Metadata