Variation order is inevitable in construction industry.There are various reasons contributing to the issuance of instruction requiring for variations. Among the reasons for variations is changes of reuirement from the client. This research is looking into the reasons caused by designers. The content...

Full description

Saved in:
Bibliographic Details
Main Authors: Borhan, Nurlıyana (Author), Mohd Ahnuar, Ezlına (Author)
Format: Book
Published: 2018.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_47552
042 |a dc 
100 1 0 |a Borhan, Nurlıyana  |e author 
700 1 0 |a Mohd Ahnuar, Ezlına  |e author 
245 0 0 |a Liabilities of designer towards variation cost in commercial buildings in Kuching, Sarawak / Nurlıyana Borhan and Ezlına Mohd Ahnuar 
260 |c 2018. 
500 |a https://ir.uitm.edu.my/id/eprint/47552/1/47552.pdf 
520 |a Variation order is inevitable in construction industry.There are various reasons contributing to the issuance of instruction requiring for variations. Among the reasons for variations is changes of reuirement from the client. This research is looking into the reasons caused by designers. The contention is that the client may have to incur unnecessary extra cost to complete the building due to the mistakes in design by the said designers. This research aims to determine the liability of designer towards variation cost in commercial buildings in Kuching, Sarawak. The specific objectives of this research are to investigate the common causes of variation orders by designers and to determine the liability of designers towards variation order. A questionnaire was sent to 89 respondents in Kuching, which comprise of consultant, contractor and client. Results shows that the top three (3) causes of variation order in the consultant's and contractor's perspectives are drawing modification, change in specification errrors and omission in design. All of these reasons were supported by court cases, in which it has been decided by the court that in the event of negligence on the part of the designers that subsequently causes the client to suffer losses, the designers may be held liable. From the client's perspective, drawing modification, conflicts between contract document and errors and omission in design were the main reasons for variation. As for the consequences, the clients is due to lack of information gave to designers, they had to develop design base on their perception.It can be concluded that none of the construction can be 100% completed according to the design or scope of work that has been agreed in the contract. 
546 |a en 
690 |a Architecture as a profession. Architects 
690 |a Architectural drawing and design 
690 |a Aesthetics of cities. City planning and beautifying 
690 |a Malaysia 
690 |a Skyscrapers 
655 7 |a Conference or Workshop Item  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/47552/ 
787 0 |n https://icrp2018.wixsite.com/icrp18 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/47552/  |z Link Metadata