Unmanned aerial system (UAS) for monitoring and communication in IBS construction project / Anis Sofea Mad Said and Wan Akmal Zahri Wan Zaharuddin

Industrial Revolution 4.0 (IR) is changes in work, workers, management and cycle of work by using technology. Industrialized Building System (IBS) construction management in site can be improve by applying IR 4.0. The problems in managing of IBS project arise from the practice of manually monitoring...

Full description

Saved in:
Bibliographic Details
Main Authors: Mad Said, Anis Sofea (Author), Wan Zaharuddin, Wan Akmal Zahri (Author)
Format: Book
Published: 2019.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_51144
042 |a dc 
100 1 0 |a Mad Said, Anis Sofea  |e author 
700 1 0 |a Wan Zaharuddin, Wan Akmal Zahri  |e author 
245 0 0 |a Unmanned aerial system (UAS) for monitoring and communication in IBS construction project / Anis Sofea Mad Said and Wan Akmal Zahri Wan Zaharuddin 
260 |c 2019. 
500 |a https://ir.uitm.edu.my/id/eprint/51144/1/51144.pdf 
520 |a Industrial Revolution 4.0 (IR) is changes in work, workers, management and cycle of work by using technology. Industrialized Building System (IBS) construction management in site can be improve by applying IR 4.0. The problems in managing of IBS project arise from the practice of manually monitoring the Precast Concrete (PC) components arrived at the site which is tedious and susceptible to human error. In addition, the problem of communication by signal person to crane operator in PC components assembling can be misinterpret. The purpose of this research is to identify the problems of IBS management onsite and to propose Unmanned Aerial System (UAS) for Monitoring and Communication (UMAC). The method used in this research are by desk study and simulation to gain the information and performance. The result is gained by simulation and differentiate the performance of UAS in market and the application in construction site. For the conclusion, Application of UMAC in IBS construction give benefits in systematic practice and use of technology in solving problems. 
546 |a en 
690 |a Systems of building construction. Industrialized building 
690 |a Malaysia 
690 |a Insulation and insulating materials 
690 |a Soundproof construction. Noise in buildings 
690 |a Management of the construction site. Superintendence of building construction 
690 |a Architectural engineering. Structural engineering of buildings 
690 |a Sustainable buildings. Sustainable construction 
655 7 |a Conference or Workshop Item  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/51144/ 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/51144/  |z Link Metadata