Barriers of green building implementation during pre-contract stage / Rabbiatul Rejina Mohd Ridah and Husrul Nizam Husin

Green building is already existing longer in construction industry and many countries had succeeded to implement the technology. But in Malaysia, many barriers have identified due to green building adoption especially among the consultant team. Quantity surveyors are to perform financial control, co...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Ridah, Rabbiatul Rejina (Author), Husin, Husrul Nizam (Author)
Format: Book
Published: 2019.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_51929
042 |a dc 
100 1 0 |a Mohd Ridah, Rabbiatul Rejina  |e author 
700 1 0 |a Husin, Husrul Nizam  |e author 
245 0 0 |a Barriers of green building implementation during pre-contract stage / Rabbiatul Rejina Mohd Ridah and Husrul Nizam Husin 
260 |c 2019. 
500 |a https://ir.uitm.edu.my/id/eprint/51929/1/51929.pdf 
520 |a Green building is already existing longer in construction industry and many countries had succeeded to implement the technology. But in Malaysia, many barriers have identified due to green building adoption especially among the consultant team. Quantity surveyors are to perform financial control, cost and contractual administration of a project from inception to completion. But they also agreed that, the evolution of the quantity surveying profession due to changes from traditional to green construction become challenges and global threats. The aim of this study is to establish the best practice of green building implementation in Malaysia from quantity surveyors' profession. The objective is to identify the barriers of green building implementation during pre-contract stage. The method used was questionnaire survey and the responses were from 56 quantity surveyors who involved in green building projects in Malaysia. The data collected analyzed by SPPS version 25. This study identified that the highest mean value for barriers of green building implementation during pre-contract stage is during tendering stage longer time during the selection process and lack of experience in green projects. 
546 |a en 
690 |a Sustainable architecture 
690 |a Malaysia 
690 |a Architectural engineering. Structural engineering of buildings 
690 |a Sustainable buildings. Sustainable construction 
655 7 |a Conference or Workshop Item  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/51929/ 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/51929/  |z Link Metadata