Firefly algorithm: Minimizing cost on single-level lot-sizing problem / Siti Hafawati Jamaluddin ... [et al.]

Nowadays, the industrial company plays a very important role to our country. However, the manufacturer industry has big issues in the production planning which called planning horizon where, the lot-sizing problem is one of the most important issues in the production planning area. In lot-sizing pro...

Full description

Saved in:
Bibliographic Details
Main Authors: Jamaluddin, Siti Hafawati (Author), Zulkipli, Nurul Azleeka (Author), Mahmud, Norwaziah (Author), Muhamat Pazil, Nur Syuhada (Author)
Format: Book
Published: UiTM Cawangan Perlis, 2018.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_54794
042 |a dc 
100 1 0 |a Jamaluddin, Siti Hafawati  |e author 
700 1 0 |a Zulkipli, Nurul Azleeka  |e author 
700 1 0 |a Mahmud, Norwaziah  |e author 
700 1 0 |a Muhamat Pazil, Nur Syuhada  |e author 
245 0 0 |a Firefly algorithm: Minimizing cost on single-level lot-sizing problem / Siti Hafawati Jamaluddin ... [et al.] 
260 |b UiTM Cawangan Perlis,   |c 2018. 
500 |a https://ir.uitm.edu.my/id/eprint/54794/1/54794.pdf 
500 |a  Firefly algorithm: Minimizing cost on single-level lot-sizing problem / Siti Hafawati Jamaluddin ... [et al.]. (2018) Journal of Computing Research and Innovation (JCRINN) <https://ir.uitm.edu.my/view/publication/Journal_of_Computing_Research_and_Innovation_=28JCRINN=29/>, 3 (1): 7. pp. 55-63. ISSN 2600-8793  
520 |a Nowadays, the industrial company plays a very important role to our country. However, the manufacturer industry has big issues in the production planning which called planning horizon where, the lot-sizing problem is one of the most important issues in the production planning area. In lot-sizing problem, the manufacturers are facing the problems in determining the setup cost when there is no consistency and efficiency in organizing the production plan. From the problem emerge, the minimum of production cost is determined by using firefly algorithm. From the minimum production cost obtained, the optimal setup cost on single-level lot-sizing problem is defined. In this study, the result is obtained by using MATLAB R2017a software to minimize the production cost on single-level lot-sizing problem where the minimum production cost is are for one month is $154 while, the minimum production cost for 12 months is $1760.89. From those minimum total cost obtained by using firefly algorithm, the optimal setup cost for one month is $86.83 while optimal setup cost for 12 months are $86.51, $86.81, $88.30, $95.39, $112.01, $102.92, $93.30, $85.90, $106.50, $85.77, $99.46 and $115.30 respectively. As a conclusion, firefly algorithm is applicable to use in minimizing production cost on single-level lot-sizing problem since the result obtained gives the better solution compared to the exact solution. 
546 |a en 
690 |a Manufacturing industries 
690 |a Algorithms 
655 7 |a Article  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/54794/ 
787 0 |n https://crinn.conferencehunter.com/ 
787 0 |n 10.24191/jcrinn.v3i1.89 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/54794/  |z Link Metadata