Shift scheduling with the goal programming approach in fast-food restaurant: McDonald's in Kelantan / Diana Sirmayunie Mohd Nasir ... [et al.]

A major fast-food restaurant chain, such as McDonald's, must perform well to maintain its credibility with customers and dominance over other competitors. A fair and balanced shift schedule of workers must be generated to ensure that the workers provide the best service and production for the r...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nasir, Diana Sirmayunie (Author), Sabri, Nur Darina Aimi (Author), Shafii, Nor Hayati (Author), Abu Hasan, Suzanawati (Author)
Format: Book
Published: UiTM Cawangan Perlis.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_60673
042 |a dc 
100 1 0 |a Mohd Nasir, Diana Sirmayunie  |e author 
700 1 0 |a Sabri, Nur Darina Aimi  |e author 
700 1 0 |a Shafii, Nor Hayati  |e author 
700 1 0 |a Abu Hasan, Suzanawati  |e author 
245 0 0 |a Shift scheduling with the goal programming approach in fast-food restaurant: McDonald's in Kelantan / Diana Sirmayunie Mohd Nasir ... [et al.] 
260 |b UiTM Cawangan Perlis. 
500 |a https://ir.uitm.edu.my/id/eprint/60673/1/60673.pdf 
520 |a A major fast-food restaurant chain, such as McDonald's, must perform well to maintain its credibility with customers and dominance over other competitors. A fair and balanced shift schedule of workers must be generated to ensure that the workers provide the best service and production for the restaurant. Consequently, this study proposed a fair and efficient workforce schedule at a McDonald's restaurant in Kelantan, Malaysia. Furthermore, the goal programming method and the LINGO software are used in this study to develop the best schedule for the workers over a 28-day period. Five hard constraints and three soft constraints are identified. The primary goal of this study, which demanded the same total workload for each worker, was met. However, the other two goals are not fully achieved but have little impact on the workers due to the 18-hour operation and rotation of schedules among workers. Finally, the generated schedule pattern has been shown to provide a better schedule in terms of having the same total number of shifts for each worker and giving each worker the same total number of off days. 
546 |a en 
690 |a Personnel management. Employment management 
690 |a Mathematical statistics. Probabilities 
655 7 |a Article  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/60673/ 
787 0 |n https://crinn.conferencehunter.com/ 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/60673/  |z Link Metadata