Improving the effectiveness of risk management among sub-contractors in the northern state of Malaysia / Nurqameela Md Radzi, Kartina Alauddin and Mohmad Mohd Derus

The risk should be managed crucially by any level of multidiscipline. Construction activities involved hazardous situations and unpredictable incidents during construction. There is a central issue triggered by sub-contractors' tasks, i.e., failure to manage the risk management of main contract...

Full description

Saved in:
Bibliographic Details
Main Authors: Md Radzi, Nurqameela (Author), Alauddin, Kartina (Author), Mohd Derus, Mohmad (Author)
Format: Book
Published: UiTM Press, 2022-01.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_65592
042 |a dc 
100 1 0 |a Md Radzi, Nurqameela  |e author 
700 1 0 |a Alauddin, Kartina  |e author 
700 1 0 |a Mohd Derus, Mohmad  |e author 
245 0 0 |a Improving the effectiveness of risk management among sub-contractors in the northern state of Malaysia / Nurqameela Md Radzi, Kartina Alauddin and Mohmad Mohd Derus 
260 |b UiTM Press,   |c 2022-01. 
500 |a https://ir.uitm.edu.my/id/eprint/65592/1/65592.pdf 
500 |a  Improving the effectiveness of risk management among sub-contractors in the northern state of Malaysia / Nurqameela Md Radzi, Kartina Alauddin and Mohmad Mohd Derus. (2022) Built Environment Journal <https://ir.uitm.edu.my/view/publication/Built_Environment_Journal/>, 19 (1): 3. pp. 23-31. ISSN 2637-0395  
520 |a The risk should be managed crucially by any level of multidiscipline. Construction activities involved hazardous situations and unpredictable incidents during construction. There is a central issue triggered by sub-contractors' tasks, i.e., failure to manage the risk management of main contractors effectively. Many factors contributed to the ineffectiveness of risk management implementation among sub-contractors, including lack of skills and expertise, lack of experience, and communication breakdown with the team. Therefore, this paper significantly provides the results of a survey of sub-contractors involved in the Northern construction projects. The goal of this study concerns the strategies to improve the effectiveness of sub-contractors in managing the risk on site. These are described with the results of the questionnaire survey analysis from 300 respondents. The respondents are from sub-contractors among G1 to G4 in the northern state of East Malaysia. Using the Kruskal-Wallis test, sixteen strategies were identified from the literature have been tested among the sub-contractors. The finding reveals that only ten approaches, i.e., effective site management and supervision, experience contractors, good feasibility studies, project understanding, thoroughly investigate vendor capabilities, frequent progress meetings, systematic coordination between parties, allocation enough resources, the right path, and proper identification of risk does give significant strategies to improve implementation of risk management among sub-contractors in the northern states of Malaysia. 
546 |a en 
690 |a Risk management. Risk in industry. Operational risk 
690 |a Contractors 
655 7 |a Article  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/65592/ 
787 0 |n https://bej.uitm.edu.my/ 
787 0 |n 10.24191/bej.v19i1.15406 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/65592/  |z Link Metadata