Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin

Industrialized Building System (IBS) is defined as a construction made of components manufactured either on or off site, then positioned and assembled into structures. The government has taken a few initiatives in order to encourage the practitioners to implement IBS in their project but the rate of...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad Shukri, Alya Ilyani (Author), Husin, Husrul Nizam (Author)
Format: Book
Published: 2021.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_73601
042 |a dc 
100 1 0 |a Mohammad Shukri, Alya Ilyani  |e author 
700 1 0 |a Husin, Husrul Nizam  |e author 
245 0 0 |a Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin 
260 |c 2021. 
500 |a https://ir.uitm.edu.my/id/eprint/73601/1/73601.pdf 
520 |a Industrialized Building System (IBS) is defined as a construction made of components manufactured either on or off site, then positioned and assembled into structures. The government has taken a few initiatives in order to encourage the practitioners to implement IBS in their project but the rate of usage of IBS is still low. The aim of this research is to study the direct and indirect cost involved in IBS construction. Objectives of the research are to identify the direct and indirect cost from the usage of IBS construction, to determine how the direct and indirect cost affect the usage of IBS construction and to recommend the improvement of IBS contractors involved with the IBS construction. In order to achieve this objective, a quantitative method of research is used and questionnaires as the tools for data collection. All data shall be analyzed using Statistical Package for Social Science (SPSS) software. All of the direct and indirect costs were known and familiar to the Contractor as most costs were known as very important costs in implementing IBS. Direct cost affects the implementation of IBS as the direct cost involvement is high. It became one of the causes behind the lack of implementation of IBS. However, indirect costs involved somehow gave advantages to the Contractors as they get profit and incentives from the Government. The result of this study may increase the number of IBS construction since the cost involved is clearly highlighted and how these costs can give advantages to the project. 
546 |a en 
690 |a Systems of building construction. Industrialized building 
690 |a Management of the construction site. Superintendence of building construction 
655 7 |a Conference or Workshop Item  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/73601/ 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/73601/  |z Link Metadata