Gap analysis on accident causation and implementation of Integrated Management System (IMS) at construction site / Azmi Che Leh, Asmalia Che Ahmad and Ahmad Qusoiri Abdul Karim
The current high fatality rate in construction accidents negatively reflects the nation's construction industry. This research aims to identify the main causes of accidents and the gap between the causes of the accident that would allow for solutions to minimise the fatality rate. Systematic Li...
Enregistré dans:
Auteurs principaux: | Che Leh, Azmi (Auteur), Che Ahmad, Asmalia (Auteur), Abdul Karim, Ahmad Qusoiri (Auteur) |
---|---|
Format: | Livre |
Publié: |
2021.
|
Sujets: | |
Accès en ligne: | Link Metadata |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Construction safe design approach / Asmalia Che Ahmad ... [et al.]
par: Che Ahmad, Asmalia, et autres
Publié: (2012) -
Rainwater harvesting system for academic building. Is it worth it? / Azirah Adnan, Asmalia Che Ahmad and Suharto Teriman
par: Azirah, Adnan, et autres
Publié: (2021) -
Tropical environment elements for green highway assessment / Asmalia Che Ahmad ...[et al.]
par: Che Ahmad, Asmalia, et autres
Publié: (2016) -
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
par: Asmalia, Che Ahmad, et autres
Publié: (2015) -
Risk analysis on hazard in high-rise construction project in Pulau Pinang / Muhammad Faisyafiq Abdul Fatah and Asmalia Che Ahmad
par: Abdul Fatah, Muhammad Faisyafiq, et autres
Publié: (2020)