Arif, W. A., , M. M., & , I. H. H. (2013). Prarancangan Pabrik Butinediol Dari Asetilen Dan Formaldehid Kapasitas 55.000 Ton Per Tahun.
Chicago Style (17th ed.) CitationArif, Wahyu Aditiya, Muhamad Mujiburohman , and Ir. H. Haryanto. Prarancangan Pabrik Butinediol Dari Asetilen Dan Formaldehid Kapasitas 55.000 Ton Per Tahun. 2013.
MLA (9th ed.) CitationArif, Wahyu Aditiya, et al. Prarancangan Pabrik Butinediol Dari Asetilen Dan Formaldehid Kapasitas 55.000 Ton Per Tahun. 2013.
Warning: These citations may not always be 100% accurate.