Analisis Pentanahan Kaki Menara Transmisi 150 Kv Rembang-Blora Bertahanan Tinggi Dan Usaha Menurunkannya
This study was done to improve the value of grounding system resistance at the tower 150 KV high-voltage network installation towers along the path, the region Rembang-Blora substations as much as 92 towers. Grounding resistance lower leg useful as a shortcut to dampen the flow lightning strikes, gr...
Saved in:
Main Authors: | Hajarsaputro, Nurcahyo (Author), , Hasyim Asya'ri, S.T., M.T (Author) |
---|---|
Format: | Book |
Published: |
2016-06-08.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS TAHANAN PENTANAHAN TOWER SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 KV TRANSMISI PALUR - SRAGEN
by: WIJAYANTO, SETIAWAN
Published: (2011) -
Evaluasi Keamanan Pada Sistem Pentanahan Gardu Induk 150 KV Jajar
by: Karuna, Hangga, et al.
Published: (2014) -
EVALUASI RELAI PROTEKSI PADA JARINGAN TRANSMISI SUTT 150 KV JAJAR - PALUR
by: ANDHIKA, RIFKI
Published: (2010) -
Analisis Penggunaan Rele Jarak Pada Sistem Transmisi Gardu Induk 150 kV Jajar Ke Gardu Induk 150 kV Banyudono
by: Mu'tashim, Qoid Zuhdi, et al.
Published: (2017) -
DISAIN SISTEM PENTANAHAN GRID-ROD GARDU INDUK 150 kV UNTUK BERBAGAI KONDISI TANAH DI LAMPUNG
by: Henry B.H. Sitorus, , et al.
Published: (2008)