Studi Perhitungan Dan Penyetelan Rele Jarak Sebagai Pengaman Utama Saluran Udara Tegangan Tinggi 150 KV

Disruption that often occurs in the power system is on the transmission line. Disorders that may be a two-phase, three-phase, single phase to earth, lightning strikes, or break up channel. Therefore, the use of a safety relay is absolutely necessary to protect and prevent the spread due to interfere...

Full description

Saved in:
Bibliographic Details
Main Authors: Arifin, Ayub Qoirul (Author), , Umar, ST.MT (Author)
Format: Book
Published: 2016.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_46469
042 |a dc 
100 1 0 |a Arifin, Ayub Qoirul  |e author 
700 1 0 |a , Umar, ST.MT  |e author 
245 0 0 |a Studi Perhitungan Dan Penyetelan Rele Jarak Sebagai Pengaman Utama Saluran Udara Tegangan Tinggi 150 KV 
260 |c 2016. 
500 |a https://eprints.ums.ac.id/46469/1/surat%20pernyataan.pdf 
500 |a https://eprints.ums.ac.id/46469/3/Tugas%20Akhir%20Final%20PDF.pdf 
520 |a Disruption that often occurs in the power system is on the transmission line. Disorders that may be a two-phase, three-phase, single phase to earth, lightning strikes, or break up channel. Therefore, the use of a safety relay is absolutely necessary to protect and prevent the spread due to interference and can accelerate recovery system from interference. Their new conductor in Priok Baru - Plumpang 150kV High Voltage (HV) it needed the adjustment relay, with the intention that the function relays work according to its function. HV new 150 kV Priok - Plumpang use within the type Micom P443 relay as the primary safety channel. It is known that the characteristics of Quadramho used as a safety relay SUTT distance of 150 kV Priok Baru - Plumpang. Based on the above problems, the coordination of the setting of distance relays installed in Gas Insulated Substation (GIS) Priok Baru and substation should be determined Plumpang value. In order along the channel can be guaranteed level of security against in terference between phase and phase to earth disturbance then obtained setting value zone 1 of 2.02 Ω ∠76 °, zone 2 amounted to 3,02 ∠ 76° Ω and zone 3 of 11.6 ∠ 760Ω. 
546 |a en 
546 |a en 
690 |a TK Electrical engineering. Electronics Nuclear engineering 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/46469/ 
787 0 |n D400120055 
856 \ \ |u https://eprints.ums.ac.id/46469/  |z Connect to this object online