Evaluasi Anggaran Biaya Dan Pelaksanaan Pada Proyek Pembangunan Gedung Kantor Kecamatan Di Sragen (Studi Kasus Pembangunan Gedung Kantor Kecamatan Di Sragen

The purpose of this study are to know and analyze: a) planning and realization of work development in the subdistrict office building of Sragen Regency, b) the cost of implementing the construction of office buildings in Sragen Regency, c) scheduling implementation of projects development when there...

Full description

Saved in:
Bibliographic Details
Main Authors: Murtono, Joko (Author), , Ir. Sri Sunarjono, MT,PhD (Author), , Ir. H. Muh. Nur Sahid, MM, MT (Author)
Format: Book
Published: 2016.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_46510
042 |a dc 
100 1 0 |a Murtono, Joko  |e author 
700 1 0 |a , Ir. Sri Sunarjono, MT,PhD  |e author 
700 1 0 |a , Ir. H. Muh. Nur Sahid, MM, MT  |e author 
245 0 0 |a Evaluasi Anggaran Biaya Dan Pelaksanaan Pada Proyek Pembangunan Gedung Kantor Kecamatan Di Sragen (Studi Kasus Pembangunan Gedung Kantor Kecamatan Di Sragen 
260 |c 2016. 
500 |a https://eprints.ums.ac.id/46510/26/11.%20NASKAH%20PUBLIKASI.pdf 
500 |a https://eprints.ums.ac.id/46510/2/02.%20HALAMAN%20DEPAN.pdf 
500 |a https://eprints.ums.ac.id/46510/4/03.%20BAB%20I.pdf 
500 |a https://eprints.ums.ac.id/46510/8/04.%20BAB%20II.pdf 
500 |a https://eprints.ums.ac.id/46510/11/05.%20BAB%20III.pdf 
500 |a https://eprints.ums.ac.id/46510/14/06.%20BAB%20IV.pdf 
500 |a https://eprints.ums.ac.id/46510/17/07.%20BAB%20V.pdf 
500 |a https://eprints.ums.ac.id/46510/28/08.%20DAFTAR%20PUSTAKA.pdf 
500 |a https://eprints.ums.ac.id/46510/30/09.%20LAMPIRAN.pdf 
500 |a https://eprints.ums.ac.id/46510/24/01.%20SURAT%20PERNYATAAN%20PUBLIKASI%20KARYA%20ILMIAH.pdf 
520 |a The purpose of this study are to know and analyze: a) planning and realization of work development in the subdistrict office building of Sragen Regency, b) the cost of implementing the construction of office buildings in Sragen Regency, c) scheduling implementation of projects development when there is a delay. Based on the results of research in previous chapters, it can be concluded that 1) implementation of the subdistrict office building development in Sragen Regency there is a delay work, 2) there is a difference between the realization with the cost of the execution plan of subdistrict office building in Sragen where the cost of implementation is lower than the cost of the plan, 3) based on the planning and implementation of development time of subdisctrics office building in Sragen Regency occurred rescheduling. 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a TA Civil Engineering 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/46510/ 
787 0 |n S100110017 
856 \ \ |u https://eprints.ums.ac.id/46510/  |z Connect to this object online