Evaluasi Pengendalian Waktu Dan Biaya Menggunakan Metode Pert(Studi Kasus: Proyek Pembangunan Gedung Ruang Kuliah Iain Pontianak)

Success in the process of project completion should be kept in 3 constraint, there are: in accordance with determined specifications, according to the specified time, and according to the specified cost. To achieve substantial and ideal construction then needed a good structured management so that p...

Full description

Saved in:
Bibliographic Details
Main Authors: Kurniasari, Frista (Author), , Mochamad Solikin, S.T., M.T., Ph.D (Author)
Format: Book
Published: 2016.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_46642
042 |a dc 
100 1 0 |a Kurniasari, Frista  |e author 
700 1 0 |a , Mochamad Solikin, S.T., M.T., Ph.D  |e author 
245 0 0 |a Evaluasi Pengendalian Waktu Dan Biaya Menggunakan Metode Pert(Studi Kasus: Proyek Pembangunan Gedung Ruang Kuliah Iain Pontianak) 
260 |c 2016. 
500 |a https://eprints.ums.ac.id/46642/48/Naskah%20publikasi-90.pdf 
500 |a https://eprints.ums.ac.id/46642/5/Halaman%20Depan.pdf 
500 |a https://eprints.ums.ac.id/46642/9/BAB%20I%20Pendahuluan.pdf 
500 |a https://eprints.ums.ac.id/46642/10/BAB%20II%20Tinjauan%20Pustaka.pdf 
500 |a https://eprints.ums.ac.id/46642/14/BAB%20III%20Landasan%20Teori.pdf 
500 |a https://eprints.ums.ac.id/46642/15/BAB%20IV%20Tahapan%20Penelitian.pdf 
500 |a https://eprints.ums.ac.id/46642/19/BAB%20V%20Pembahasan.pdf 
500 |a https://eprints.ums.ac.id/46642/21/BAB%20VI%20Penutup.pdf 
500 |a https://eprints.ums.ac.id/46642/26/Daftar%20Pustaka.pdf 
500 |a https://eprints.ums.ac.id/46642/43/LAMPIRAN_1.pdf 
500 |a https://eprints.ums.ac.id/46642/39/Doc2.pdf 
500 |a https://eprints.ums.ac.id/46642/46/Naskah%20publikasi-90.pdf 
520 |a Success in the process of project completion should be kept in 3 constraint, there are: in accordance with determined specifications, according to the specified time, and according to the specified cost. To achieve substantial and ideal construction then needed a good structured management so that projects can be completed on time and on schedule. This research aimed to analyze the time which is most effective and efficient, also the completion probability project of Pontianak IAIN Lecture Hall Building construction, Kalimantan Barat and compare between implementation in the field with calculation using PERT method (Project Evaluation Review Technique). This research is included quantitative research, the type of data that obtained is not only collected and arranged but also data analysis. The data obtained by conducting interviews and project data. Analysis methods which used is PERT (Project Evaluation Review Technique) method by the reason that the level of uncertainty is enormous and time schedule planning is more important than costs planning. PERT method is used to obtain time analysis, effective and efficient cost using PERT diagram. The results that is obtained from this final assignment in the form of Trial and Error I with 66 days of crashing time from normal day which is 77 days and have a critical time of 57 days with generating critical cost of Rp 13,668,720,557.68 with the successful probability 11 days faster from critical time is 76,11%, whereas Trial and Error II with 63 days of crashing time 14 days faster from normal day has a critical 57 days by generating critical cost of Rp 21,234,955,108.36 with the successful probability 6 days faster from critical time is 73,89% and Trial and Error III in the its execution late 7 days of schedules have critical time 82 days with generating critical cost of Rp 24,547,837,367.39 and fine penalty cost of Rp 166,095,363.74 with the successful probability 2 days slower from critical time is 56,36%. 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a TA Civil Engineering 
690 |a TH Building construction 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/46642/ 
787 0 |n D100120062 
856 \ \ |u https://eprints.ums.ac.id/46642/  |z Connect to this object online