Evaluasi Pengendalian Waktu Dan Biaya Menggunakan Metode Pert(Studi Kasus: Proyek Pembangunan Gedung Ruang Kuliah Iain Pontianak)
Success in the process of project completion should be kept in 3 constraint, there are: in accordance with determined specifications, according to the specified time, and according to the specified cost. To achieve substantial and ideal construction then needed a good structured management so that p...
Saved in:
Main Authors: | Kurniasari, Frista (Author), , Mochamad Solikin, S.T., M.T., Ph.D (Author) |
---|---|
Format: | Book |
Published: |
2016.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE CPM, PERT, DAN CRASHING PADA PROYEK PEMBANGUNAN KANTOR KELURAHAN
by: Muhammad Sirozjudin Munir,
Published: (2022) -
Analisa Pengendalian Manajemen Waktu Dan Biaya Proyek Pembangunan Hotel Dengan Network CPM Studi Kasus : Batiqa Hotel Palembang
by: Hardianto, Agung, et al.
Published: (2015) -
Pengendalian Waktu Dan Biaya Menggunakan Metode Pert Pada Proyek Pltu Tanjung Jati B Unit 3 Dan 4 Kabupaten Jepara
by: Eefendi, Ersan, et al.
Published: (2014) -
OPTIMASI WAKTU DAN BIAYA PADA PROYEK A DENGAN METODE CPM DAN PERT DI PT. XYZ
by: Reni Wulandari,
Published: (2020) -
OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI
by: Wendi Juliansyah,
Published: (2022)