Analisis Koordinasi Over Current Relay Dan Recloser Pada Sistem Distribusi 20kv Penyulang Palur12 Menggunakan Etap 12.6
Short circuit interruption that often occur at the distribution system 20KV can cause distruption of the distribution of electrical energy to the consumer. This short circuit interruption can be resolved by doing the coordination of protection at distribution system 20KV to isolate the interference...
Kaydedildi:
Asıl Yazarlar: | Kurniawan Saputro, Azanto (Yazar), , Umar,ST.MT (Yazar) |
---|---|
Materyal Türü: | Kitap |
Baskı/Yayın Bilgisi: |
2016.
|
Konular: | |
Online Erişim: | Connect to this object online |
Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Studi Analisa Koordinasi Menggunakan Relay OCR (OVER CURRENT RELAY) Untuk Gangguan Hubung Singkat Pada Penyulang 2 Distribusi 20 KV GI Jajar Surakarta Menggunakan ETAP 12.6
Yazar:: Sofa, Muhammad Dhoi Fathoni, ve diğerleri
Baskı/Yayın Bilgisi: (2017) -
Analisa Koordinasi Recloser Dan OCR (Over Current Relay) Untuk Gangguan Hubung Singkat Pada Penyulang 3 Distribusi 20 KV Gi Jajar
Yazar:: Syafi'i Alfian, Alfian, ve diğerleri
Baskı/Yayın Bilgisi: (2016) -
Analisa Jatuh Tegangan Dan Penanganan Pada Jaringan Distribusi 20 kV Rayon Palur Pt. PLN (Persero) Menggunakan Etap 12.6
Yazar:: Kurniawan, Arif, ve diğerleri
Baskı/Yayın Bilgisi: (2017) -
Pengaruh Sistem Pengetanahan Terhadap Arus Gangguan Tanah Pada Sistem Distribusi 20 Kv Di PLN Palur Dengan Menggunakan Etap 12.6
Yazar:: Pangeran Alfidin, Mohammad, ve diğerleri
Baskı/Yayın Bilgisi: (2016) -
KOORDINASI RELAY OCR, GFR DAN RECLOSER PASCA UPRATING TRANSFORMATOR TENAGA PADA PENYULANG MJO 01 GARDU INDUK MOJOSONGO
Yazar:: Ilyas Habil Agnia, -
Baskı/Yayın Bilgisi: (2022)