Analisis Koordinasi Over Current Relay Dan Recloser Pada Sistem Distribusi 20kv Penyulang Palur12 Menggunakan Etap 12.6
Short circuit interruption that often occur at the distribution system 20KV can cause distruption of the distribution of electrical energy to the consumer. This short circuit interruption can be resolved by doing the coordination of protection at distribution system 20KV to isolate the interference...
Saved in:
Main Authors: | Kurniawan Saputro, Azanto (Author), , Umar,ST.MT (Author) |
---|---|
Format: | Book |
Published: |
2016.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Studi Analisa Koordinasi Menggunakan Relay OCR (OVER CURRENT RELAY) Untuk Gangguan Hubung Singkat Pada Penyulang 2 Distribusi 20 KV GI Jajar Surakarta Menggunakan ETAP 12.6
by: Sofa, Muhammad Dhoi Fathoni, et al.
Published: (2017) -
Analisa Koordinasi Recloser Dan OCR (Over Current Relay) Untuk Gangguan Hubung Singkat Pada Penyulang 3 Distribusi 20 KV Gi Jajar
by: Syafi'i Alfian, Alfian, et al.
Published: (2016) -
Analisa Jatuh Tegangan Dan Penanganan Pada Jaringan Distribusi 20 kV Rayon Palur Pt. PLN (Persero) Menggunakan Etap 12.6
by: Kurniawan, Arif, et al.
Published: (2017) -
Pengaruh Sistem Pengetanahan Terhadap Arus Gangguan Tanah Pada Sistem Distribusi 20 Kv Di PLN Palur Dengan Menggunakan Etap 12.6
by: Pangeran Alfidin, Mohammad, et al.
Published: (2016) -
KOORDINASI RELAY OCR, GFR DAN RECLOSER PASCA UPRATING TRANSFORMATOR TENAGA PADA PENYULANG MJO 01 GARDU INDUK MOJOSONGO
by: Ilyas Habil Agnia, -
Published: (2022)