Prarancangan Pabrik Sodium SilikatDari Pasir Silika Dan Natrium Hidroksida Kapasitas 65.000 Ton Per Tahun

Sodium silicate plant with raw materials of sodium hydroxide and silica sand, is planned to be established in the industrial area of Gresik with a capacity of 65,000 tons/year. In the process of producing sodium silicate is performed using continueous stirred tank reactor (CSTR) by reacting sodium h...

Full description

Saved in:
Bibliographic Details
Main Authors: Zarmica, Ade Juli (Author), , M Mujiburrohman, S.T., M.T., Ph.D (Author), , Rois Fatoni, S.T., M.Sc., Ph.D (Author)
Format: Book
Published: 2016.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_47540
042 |a dc 
100 1 0 |a Zarmica, Ade Juli  |e author 
700 1 0 |a , M Mujiburrohman, S.T., M.T., Ph.D  |e author 
700 1 0 |a , Rois Fatoni, S.T., M.Sc., Ph.D.  |e author 
245 0 0 |a Prarancangan Pabrik Sodium SilikatDari Pasir Silika Dan Natrium Hidroksida Kapasitas 65.000 Ton Per Tahun 
260 |c 2016. 
500 |a https://eprints.ums.ac.id/47540/22/NASKAH%20PUBLIKASI-ade.pdf 
500 |a https://eprints.ums.ac.id/47540/20/HALAMAN%20DEPAN.pdf 
500 |a https://eprints.ums.ac.id/47540/3/BAB%20I.pdf 
500 |a https://eprints.ums.ac.id/47540/4/BAB%20II.pdf 
500 |a https://eprints.ums.ac.id/47540/7/BAB%20III.pdf 
500 |a https://eprints.ums.ac.id/47540/8/BAB%20IV.pdf 
500 |a https://eprints.ums.ac.id/47540/9/BAB%20V.pdf 
500 |a https://eprints.ums.ac.id/47540/10/BAB%20VI.pdf 
500 |a https://eprints.ums.ac.id/47540/11/DAFTAR%20PUSTAKA.pdf 
500 |a https://eprints.ums.ac.id/47540/12/LAMPIRAN.pdf 
500 |a https://eprints.ums.ac.id/47540/17/PERNYATAAN%20PUBLIKASI.pdf 
520 |a Sodium silicate plant with raw materials of sodium hydroxide and silica sand, is planned to be established in the industrial area of Gresik with a capacity of 65,000 tons/year. In the process of producing sodium silicate is performed using continueous stirred tank reactor (CSTR) by reacting sodium hydroxide and silica sand. In the reactor the reaction undergoes liquid-liquid phase, endothermic, with operating temperatures of 220OC and a pressure of 24 bar. To produce sdium silica the process requires raw materials including 3029.54 kgs/hour of sodium hydroxide and 5696.8 kgs/hour of silica sand. The process also needs utilities including 64,394.34 kgs/hour of water, 8,175.9 kgs/hour of steam, 520 liters/hour of fuel diesel, 587.4 kW of electricity obtained from the PLN, and 587.4 kW of generator as backup need 79.01 liters / hour of fuel. Sodium silicate plant with a capacity of 65,000 tons/year. The plant is planned to operate for 330 days/year, and will be established in East Java Gresik Industrial area with a land area of 12,371 m2 and the number of employees is 188 people. The sodium silicate plant require the production costs Rp241,686,040,102.00. The economic analysis of this plant showed a profit before tax of Rp66,338,756,994.00 per year, after tax profits reached Rp49,754,667,745.00 25% per year. The Percent Return On Investment (ROI) before tax 27.4% and 20.6% after taxes. The Pay Out Time (POT) before tax is was 2.67 years and 3.27 years after tax. The Break Even Point (BEP) amounted to 53.6% and the Shut Down Point (SDP) of 28.2%. The Interval rate of return (IRR) accounted for 46.05%. From these analysis economy concluded that the plant is profitable and feasible to set. 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a Q Science (General) 
690 |a QD Chemistry 
690 |a TP Chemical technology 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/47540/ 
787 0 |n D500100050 
856 \ \ |u https://eprints.ums.ac.id/47540/  |z Connect to this object online