Kajian Dam Break Waduk Wonogiri Dengan Hec-Ras 4.0

Dam is water building which serves to stem the flow of the river order to obtain water reservoir river. To making dam must is designed with standard security high that the dam secure against overtopping ( to flooding plan ), a piping and burden the devastating earthquake. Dam in wonogiri was huge we...

Full description

Saved in:
Bibliographic Details
Main Authors: Rohani, Ichwan Dwi (Author), , Gurawan Djati Wibowo, ST., M.Eng (Author), , Ir. Achmad Karim Fatchan.,M.T (Author)
Format: Book
Published: 2017.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_49578
042 |a dc 
100 1 0 |a Rohani, Ichwan Dwi  |e author 
700 1 0 |a , Gurawan Djati Wibowo, ST., M.Eng.  |e author 
700 1 0 |a , Ir. Achmad Karim Fatchan.,M.T  |e author 
245 0 0 |a Kajian Dam Break Waduk Wonogiri Dengan Hec-Ras 4.0 
260 |c 2017. 
500 |a https://eprints.ums.ac.id/49578/19/NAskah%20publikasi%201.pdf 
500 |a https://eprints.ums.ac.id/49578/17/HALAMAN%20DEPAN.pdf 
500 |a https://eprints.ums.ac.id/49578/3/BAB%20I.pdf 
500 |a https://eprints.ums.ac.id/49578/5/BAB%20II.pdf 
500 |a https://eprints.ums.ac.id/49578/6/BAB%20III.pdf 
500 |a https://eprints.ums.ac.id/49578/8/BAB%20IV.pdf 
500 |a https://eprints.ums.ac.id/49578/10/BAB%20V.pdf 
500 |a https://eprints.ums.ac.id/49578/12/BAB%20VI.pdf 
500 |a https://eprints.ums.ac.id/49578/14/DAFTAR%20PUSTAKA.pdf 
500 |a https://eprints.ums.ac.id/49578/15/PERNYATAAN%20PUBLIKASI.pdf 
500 |a https://eprints.ums.ac.id/49578/18/LAMPIRAN.pdf 
520 |a Dam is water building which serves to stem the flow of the river order to obtain water reservoir river. To making dam must is designed with standard security high that the dam secure against overtopping ( to flooding plan ), a piping and burden the devastating earthquake. Dam in wonogiri was huge we need to meet the security standards applied of them are analysis and break when a when there was rupture or collapse so of the surrounding community and part downstream can save self that not hit by hack flood . Evaluation of these floods using rainfall data were 9 stations include stations Slogohimo, station Jatisrono, station Girimarto PP, station Sidoharjo, station Ngancar, station Baturetno PP, station Giriwoyo, station Kedung Uling and stations Wuryantoro divided into 5 DAS include DAS Kedoang, Temon DAS, Bengawan solo upstream DAS, Posong DAS and Kedung Uling DAS. Flooding due Dam Break searches in reservoirs and Gajah Mungkur use application methods HEC - RAS 4.0 According to the comparison of the results of the hydrograph QPMF, Q1000 years, Q100 years and Q50 years, QPMF larger. Radiation flood hydrograph downstream to the naked eye can translasion, damped (reduced) by more downstream flood peak is getting smaller. The maximum flood peak attenuation (PMF flood hydrograph) is point most downstream (in AWLR Jurug), by 23%. Attenuation of flood peak maximum possible (flood hydrograph Q1000 yrs) is point most downstream (in AWLR Jurug), of 15%, the attenuation of flood peak maximum possible (flood hydrograph Q100 yrs) is dititik most downstream (in AWLR Jurug), of 13%, the maximum flood peak attenuation (Q50 flood hydrograph yrs) is point most downstream (in AWLR Jurug), of 12%. Results of search analytics Dam break flood due to the application of HEC - RAS 4.0 shows the results of the data flood hydrograph when through in the dam body QPMF, Q1000 years, Q100 years and Q50 years, the greater QPMF the nearest future, the highest elevation and high speed. 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a X General Subject 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/49578/ 
787 0 |n D100120063 
856 \ \ |u https://eprints.ums.ac.id/49578/  |z Connect to this object online