Analisa Ekonomi Pembangunan Waduk Pidekso Ds. Pidekso, Kec. Giriwoyo, Kabupaten Wonogiri Dengan Menggunakan Metode IRR, BCR Dan BEP

Pidekso reservoir is one of the reservoir in Wonogiridistric that will develop in 2017. Pidekso reservoir function is to supply water irrigation, 1500 ha andmunipical water, 2500 person. With the developing Pidekso reservoir, the production of ricefield can increased and that is increase the farmers...

Full description

Saved in:
Bibliographic Details
Main Authors: SAFITRI, DEVY APRILIA AYU (Author), , Ir. AchmadKarimFatchan, M.T (Author), , Gurawan Djati W, S.T, M.Eng (Author)
Format: Book
Published: 2017-04-07.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_51034
042 |a dc 
100 1 0 |a SAFITRI, DEVY APRILIA AYU  |e author 
700 1 0 |a , Ir. AchmadKarimFatchan, M.T  |e author 
700 1 0 |a , Gurawan Djati W, S.T, M.Eng  |e author 
245 0 0 |a Analisa Ekonomi Pembangunan Waduk Pidekso Ds. Pidekso, Kec. Giriwoyo, Kabupaten Wonogiri Dengan Menggunakan Metode IRR, BCR Dan BEP 
260 |c 2017-04-07. 
500 |a https://eprints.ums.ac.id/51034/27/NASKAH%20PUBLIKASI%20%281%29.pdf 
500 |a https://eprints.ums.ac.id/51034/26/HALAMAN%20DEPAN.pdf 
500 |a https://eprints.ums.ac.id/51034/3/BAB%20I.pdf 
500 |a https://eprints.ums.ac.id/51034/4/BAB%20II.pdf 
500 |a https://eprints.ums.ac.id/51034/5/BAB%20III.pdf 
500 |a https://eprints.ums.ac.id/51034/6/BAB%20IV.pdf 
500 |a https://eprints.ums.ac.id/51034/9/BAB%20V.pdf 
500 |a https://eprints.ums.ac.id/51034/16/BAB%20VI.pdf 
500 |a https://eprints.ums.ac.id/51034/17/DAFTAR%20PUSTAKA.pdf 
500 |a https://eprints.ums.ac.id/51034/23/LAMPIRAN.pdf 
500 |a https://eprints.ums.ac.id/51034/19/SURAT%20PERNYATAAN%20NASKAH%20PUBLIKASI.pdf 
520 |a Pidekso reservoir is one of the reservoir in Wonogiridistric that will develop in 2017. Pidekso reservoir function is to supply water irrigation, 1500 ha andmunipical water, 2500 person. With the developing Pidekso reservoir, the production of ricefield can increased and that is increase the farmers income. The research scope is analysis economic value of Pidekso Reservoir by tree method, namely : BCR (Benefit Cost Ratio), IRR (Internal Rate of Return) and the BEP (Break event Point). Result of the Research is the Net Present Value (NPV) of Rp. 13,288,118,378; NPV >0 (it is worth it), Benefit Cost Ratio (BCR) 1.56> 1 (investment worth it), Internal Rate of Return 11.01% (the project is feasible), Break Event Point 12.48 when everage cashflow and age of the reservoir are 3 years, 50 year, respect fively. Therefore, the contruction investment is feasible. And then contruction of Pidekso Reservoir can be implemented. 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a TA Civil Engineering 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/51034/ 
787 0 |n D100110050 
856 \ \ |u https://eprints.ums.ac.id/51034/  |z Connect to this object online