Prarancangan Pabrik Metil Klorida Dengan Proses Hidroklorinasi Metanol Kapasitas 100.000 Ton/Tahun

The methyl chloride plant is designed with a capacity of 100.000 tons / year which operates 330 days per year and is continuous. The plant is planned to be established in 2020 area of Cilegon, Banten. The selection of the venue is based on the provision of raw materials, transportation, labor, and m...

Full description

Saved in:
Bibliographic Details
Main Authors: Saptyana, Eka (Author), , Hamid Abdillah, S.T., M.T (Author), , Eni Budiyati, S.T., M.Eng (Author)
Format: Book
Published: 2017.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Connect to this object online

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available