Studi Analisa Koordinasi Menggunakan Relay OCR (OVER CURRENT RELAY) Untuk Gangguan Hubung Singkat Pada Penyulang 2 Distribusi 20 KV GI Jajar Surakarta Menggunakan ETAP 12.6
Networks distributed on each feeder have different defects, this is due to several factors: internal and external factors. Efforts to minimize all the disturbance PLN has done maintenance and maintenance. This disorder is caused by the increase of power from the consumer and the power supply flow fr...
Guardado en:
Autores principales: | Sofa, Muhammad Dhoi Fathoni (Autor), , Umar, S.T., M.T (Autor) |
---|---|
Formato: | Libro |
Publicado: |
2017.
|
Materias: | |
Acceso en línea: | Connect to this object online |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Analisa Koordinasi Recloser Dan OCR (Over Current Relay) Untuk Gangguan Hubung Singkat Pada Penyulang 3 Distribusi 20 KV Gi Jajar
por: Syafi'i Alfian, Alfian, et al.
Publicado: (2016) -
ANALISIS GANGGUAN HUBUNG SINGKAT PENYULANG JAJAR01 MENGGUNAKAN SOFTWARE ETAP
por: AZIS, MOHAMMAD WAHYU
Publicado: (2011) -
Studi Analisis Gangguan Hubung Singkat Jaringan Transmisi GI Jajar-Gondangrejo-Palur Menggunakan ETAP 12.6
por: Pratama, Yaniar Nur Ihsan, et al.
Publicado: (2017) -
Analisis Koordinasi Over Current Relay Dan Recloser Pada Sistem Distribusi 20kv Penyulang Palur12 Menggunakan Etap 12.6
por: Kurniawan Saputro, Azanto, et al.
Publicado: (2016) -
ANALISIS KOORDINASI OCR (OVER CURRENT RELAY) PADA PENYULANG SGN 04 GARDU INDUK SANGGRAHAN
por: Rizki Mochamad Fauzi, -
Publicado: (2021)