PERANCANGAN JARINGAN DISTRIBUSI 20 KV DI PT INDORAMA PURWAKARTA

Semakin banyaknya beban listrik dikawasan PT Indorama dikarenakan ada penambahan pabrik baru PT Indorama berencana melakukan pengembangan pembangkit untuk memenuhi kebutuhan listrik di kawasan industri. Oleh karena itu PT Indorama berencana menambah gardu induk unit 3. Dengan adanya rencana pembangu...

Full description

Saved in:
Bibliographic Details
Main Author: Hidayatullah, Rahmat (Author)
Format: Book
Published: 2017-06-30.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Semakin banyaknya beban listrik dikawasan PT Indorama dikarenakan ada penambahan pabrik baru PT Indorama berencana melakukan pengembangan pembangkit untuk memenuhi kebutuhan listrik di kawasan industri. Oleh karena itu PT Indorama berencana menambah gardu induk unit 3. Dengan adanya rencana pembangunan gardu induk tersebut, maka diperlukan juga perencanaan jaringan distribusi 20 kV dengan luas area lintasanyaitu 2430m2 dengan jalur saluran kabel tegangan menengah sepanjang 690m dari trafo distribusi unit 3 sampai ke trafo beban pabrik baru. Pembangunan SKTM 20 kV Unit 3 ini direncanakan akan menyalurkan daya sebesar 31.5KA /sirkit. Saluran jaringan tegangan menengah ini diharapkan dapat mensupply energi listrik dari Captive Power Plant (CPP) Indorama ke pabrik baru indorama yang akan digunakan untuk pengembangan industry dan meningkatkan kehandalan dan efisiensi beban biaya jangka panjang pada PT Indorama Purwakarta. ;--- The more electricity load in PT Indorama area due to the addition of new factory PT Indorama plans to develop the plant to meet the electricity needs in the industrial area. Therefore PT Indorama plans to add substation Unit 3. With the development plan of the substation, it is also necessary to plan the 20 kVdistribution networks with a trajectory area of 2430m2 with a 690m mains line cable line from distribution transformer of unit 3 to the new factory load transformer. Construction of medium voltage cable channels 20 kV Unit 3 was planned to deliver power as big as 31.5KA /circuit. Medium voltage cable channels expected to supply electrical energy from Captive Power Plant (CPP) Indorama to new Indorama factory which will be used for industrial development and improve reliability and long-term cost efficiency costs of PT Indorama Purwakarta.
Item Description:http://repository.upi.edu/32224/1/S_TE_1000777_Title.pdf
http://repository.upi.edu/32224/2/S_TE_1000777_Abstract.pdf
http://repository.upi.edu/32224/3/S_TE_1000777_Table_Of_Content.pdf
http://repository.upi.edu/32224/4/S_TE_1000777_Chapter1.pdf
http://repository.upi.edu/32224/5/S_TE_1000777_Chapter2.pdf
http://repository.upi.edu/32224/6/S_TE_1000777_Chapter3.pdf
http://repository.upi.edu/32224/7/S_TE_1000777_Chapter4.pdf
http://repository.upi.edu/32224/8/S_TE_1000777_Chapter5.pdf
http://repository.upi.edu/32224/9/S_TE_1000777_Bibliography.pdf
http://repository.upi.edu/32224/10/S_TE_1000777_Appendix1.pdf
http://repository.upi.edu/32224/11/S_TE_1000777_Appendix2.pdf