ANALISIS RISIKO KECELAKAAN KERJA PADA PROSES UNLOADING OCTG DENGAN METODE JOB SAFETY ANALYSIS (JSA) DI PERTAMINA EP (EXPLORATION AND PRODUCTION) REGIONAL 2 ZONA 5 BLOK ABAR-ANGGURSI

This study aims to determine the potential hazards, risk assessment and control measures carried out in the OCTG unloading process using the Job Safety Analysis (JSA) method. Data collection techniques using questionnaires/interviews and direct observation. The results of research at Pertamina EP (E...

Full description

Saved in:
Bibliographic Details
Main Author: Dinda Yuliana, - (Author)
Format: Book
Published: 2021-08-25.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupi_69354
042 |a dc 
100 1 0 |a Dinda Yuliana, -  |e author 
245 0 0 |a ANALISIS RISIKO KECELAKAAN KERJA PADA PROSES UNLOADING OCTG DENGAN METODE JOB SAFETY ANALYSIS (JSA) DI PERTAMINA EP (EXPLORATION AND PRODUCTION) REGIONAL 2 ZONA 5 BLOK ABAR-ANGGURSI 
260 |c 2021-08-25. 
500 |a http://repository.upi.edu/69354/1/S_PEM_1706039_Title.pdf 
500 |a http://repository.upi.edu/69354/2/S_PEM_1706039_Chapter1.pdf 
500 |a http://repository.upi.edu/69354/3/S_PEM_1706039_Chapter2.pdf 
500 |a http://repository.upi.edu/69354/4/S_PEM_1706039_Chapter3.pdf 
500 |a http://repository.upi.edu/69354/5/S_PEM_1706039_Chapter4.pdf 
500 |a http://repository.upi.edu/69354/6/S_PEM_1706039_Chapter5.pdf 
500 |a http://repository.upi.edu/69354/7/S_PEM_1706039_Appendix.pdf 
520 |a This study aims to determine the potential hazards, risk assessment and control measures carried out in the OCTG unloading process using the Job Safety Analysis (JSA) method. Data collection techniques using questionnaires/interviews and direct observation. The results of research at Pertamina EP (Exploration and Production) Regional 2 Zone 5 Block Abar-Anggursi show that there is a potential for work accidents in the OCTG unloading job and control measures can be taken, namely by preparing work permit documents/risk studies by way of elimination, substitution, engineering control , administrative control, or PPE (Personal Protective Elimination), the risk assessment results obtained with a large category of 8, 11 in the medium category, 1 in the small category, and 0 in the very small category. After carrying out the control plan using the job safety analysis (JSA) method, the results obtained: there are no jobs with very high risk/NOA, large risk, medium risk, small risk, and jobs with very small risk categories as many as 29 risks. 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a HD28 Management. Industrial Management 
690 |a L Education (General) 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upi.edu/69354/ 
787 0 |n http://repository.upi.edu; 
856 |u https://repository.upi.edu/69354  |z Link Metadata