PERENCANAAN PEMASANGAN JARINGAN TEGANGAN MENENGAH UNTUK TRAFO 1000 KVA (STUDI KASUS DI GEDUNG FPTK DAN COE)

Jaringan tegangan menengah sering disebut juga jaringan distribusi primer adalah suatu bagian dari sistem tenaga listrik antara gardu induk dan gardu distribusi. Penyaluran tenaga listrik pada jaringan distribusi primer menggunakan 3 sistem saluran diantaranya saluran kawat udara, saluran kabel dan...

Full description

Saved in:
Bibliographic Details
Main Author: Teuku Faisal Ibrahim, - (Author)
Format: Book
Published: 2022-01-27.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Jaringan tegangan menengah sering disebut juga jaringan distribusi primer adalah suatu bagian dari sistem tenaga listrik antara gardu induk dan gardu distribusi. Penyaluran tenaga listrik pada jaringan distribusi primer menggunakan 3 sistem saluran diantaranya saluran kawat udara, saluran kabel dan sistem kabel tanah. Pada pendistribusian tenaga listrik ke pengguna tenaga listrik di suatu kawasan, perencanaan pemasangan jaringan tegangan menengah merupakan hal penting agar terhindar dari rugi-rugi daya (losses), tidak efisiennya biaya yang dikeluarkan, dan berbagai kerusakan pada jaringan tegangan menengah.. Penelitian ini bertujuan untuk mengetahui bagaimana tahap-tahap perencanaan pemasangan jaringan tegangan menengah berupa perencanaan denah kabel, rencana penarikan jaringan dan struktur urugan tanahnya. Metode analisis yang dilakukan berupa perhitungan melalui data yang telah didapat berupa denah penarikan kabel, kabel apa yang digunakan dalam denah tersebut dan mengapa kabel tersebut digunakan, lalu mengolahnya, kemudian bagaimana konstruksi kabel bawah tanahnya dan komponen pada kubikel tegangan menengah, kemudian perhitungan yang dilakukan dengan rumus untuk mencari arus beban penuh, drop tegangan, untuk mendapatkan luas penampang dari kabel, dan menghitung kapasitas Fuse. Hasil penelitian ini menunjukan bahwa luas penampang kabel yang digunakan pada perencanaan pemasangan jaringan tegangan mnengah ini adalah 240 mm2 , kemudian trafo yang digunakan adalah trafo dengan kapasitas 1000 kVA, struktur urugan tanah yang sedikit berbeda dari Standar Konstruksi Jaringan dengan kedalaman galian tanah yaitu hanya 75 cm, dan Fuse yang digunakan sebagai pengaman pada kubikel dengan rating 63 A. The medium voltage network, also known as the primary distribution network, is a part of the electric power system between substations and distribution substations. The distribution of electricity in the primary distribution network uses 3 channel systems including aerial wire lines, cable lines and ground cable systems. In the distribution of electricity to electric power users in an area, planning for the installation of a medium voltage network is important in order to avoid power losses (losses), inefficient costs incurred, and various damages to the medium voltage network. This study aims to knowing how the stages of planning the installation of a medium-voltage network are in the form of cable layout planning, network withdrawal plans and the earthfill structure. The descriptive analysis method is carried out in the form of a scientific explanation of the data that has been obtained in the form of a cable drawing plan, what cable is used in the plan and why the cable is used, then how the underground cable construction and the network withdrawal plan, then the calculations are carried out with the formula for find the full load current, voltage drop, to get the cross-sectional area of the cable, and calculate the NH Fuse capacity. The results of this study indicate that the cross�sectional area of the cable used in planning the installation of this medium voltage network is 240 mm2, then the transformer used is a transformer with a capacity of 1000 kVA, the soil backfill structure is slightly different from the Network Construction Standard with a soil excavation depth of only 75 cm. , and Fuse which is used as a safety on cubicle with rating 63A.
Item Description:http://repository.upi.edu/70839/1/S_TE_1703016_Title.pdf
http://repository.upi.edu/70839/2/S_TE_1703016_Chapter1.pdf
http://repository.upi.edu/70839/3/S_TE_1703016_Chapter2.pdf
http://repository.upi.edu/70839/4/S_TE_1703016_Chapter3.pdf
http://repository.upi.edu/70839/5/S_TE_1703016_Chapter4.pdf
http://repository.upi.edu/70839/6/S_TE_1703016_Chapter5.pdf
http://repository.upi.edu/70839/7/S_TE_1703016_Appendix.pdf