PERBANDINGAN JADWAL DAN BIAYA PROYEK DENGAN LINEAR SCHEDULING METHOD (LSM)
Project scheduling is one of the stages in a construction project which one of its functions is to be a control tool in the implementation stage to avoid delays. On the planning stage, it is necessary to develop an appropriate scheduling method according to the characteristics of the project so that...
Saved in:
Main Author: | Tania Asyura Shafa Hamidah, - (Author) |
---|---|
Format: | Book |
Published: |
2022-08-29.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
EVALUASI JADWAL DAN BIAYA PROYEK DENGAN LINEAR SCHEDULING METHOD (LSM)
by: Rizkqy Yuswiddi Juanda, -
Published: (2018) -
EVALUASI PENJADWALAN BERULANG DENGAN MENGGUNAKAN METODE LINEAR SCHEDULING METHOD (LSM ) PADA PROYEK GEDUNG GELANGGANG GENERASI MUDA
by: Endah Rochmalasari, -
Published: (2019) -
TINJAUAN JADWAL DAN BIAYA PROYEK DENGAN METODE PDM (PRECEDENCE DIAGRAM METHOD) PADA PEMBANGUNAN JALAN BEBAS HAMBATAN
by: Ragil Ginanjar Santoso, -
Published: (2019) -
PENGARUH METODE PELAKSANAAN STRUKTUR BAWAH JEMBATAN TERHADAP JADWAL DAN BIAYA PROYEK (Studi Kasus pada Proyek Pembangunan Jembatan Penghubung antara Pulau Golf Island dan River Walk - Pantai Indah Kapuk)
by: Rossa Destia, -
Published: (2019) -
Jadwal Imunisasi Rekomendasi IDAI
by: Sari Pediatri
Published: (2016)