KOMPARASI PERHITUNGAN KEBUTUHAN BAHANDENGAN METODA MODERN DAN METODA PU/ LOKAL KONTRAKTOR PADA PROYEK PEMBANGUNAN GEDUNGREKTORAT UNPAD BANDUNG
-
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2006-07.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | - |
---|---|
Item Description: | http://repository.upi.edu/85828/1/D3_TB_032442_Titles.pdf http://repository.upi.edu/85828/2/D3_TB_032442_Chapter1.pdf http://repository.upi.edu/85828/3/D3_TB_032442_Chapter2.pdf http://repository.upi.edu/85828/4/D3_TB_032442_Chapter3.pdf http://repository.upi.edu/85828/5/D3_TB_032442_Chapter4.pdf http://repository.upi.edu/85828/6/D3_TB_032442_Chapter5.pdf http://repository.upi.edu/85828/7/D3_TB_032442_Apendix.pdf |