KOMPARASI PERHITUNGAN KEBUTUHAN BAHANDENGAN METODA MODERN DAN METODA PU/ LOKAL KONTRAKTOR PADA PROYEK PEMBANGUNAN GEDUNGREKTORAT UNPAD BANDUNG
-
Saved in:
Main Author: | Bubun Alamsyah, - (Author) |
---|---|
Format: | Book |
Published: |
2006-07.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PENGARUH METODA LATIHAN BERDISTRIBUSI DAN METODA LATIHAN PADAT TERHADAP PENGUASAAN KETERAMPILAN SERIAL : Experimen Dalam Permainan Bola Voli
by: Ade Angga, -
Published: (1991) -
PENGARUH METODA LATIHAN BERDRISTRIBUSI DAN METODA LATIHAN PADAT TERHADAP PENGUASAAN KETERAMPILAN SERIAL :Eksperimen Dalam Permainan Bola Voli
by: Ade Angga, -
Published: (1991) -
KAJIAN METODA PELAKSANAAN KONSTRUKSIPADA PROYEK PEMBANGUNAN RUMAH SUSUN SEDERHANA DAN SEWA (RUSUNA WA) CIGUGUR TENGAH - CIMAHI
by: Asep Djamaludin R, -
Published: (2007) -
KOMPARASI METODA NEDELSKY DAN ANGOFF DALAM PENETAPAN STANDARD SETTING KELULUSAN UJIAN NASIONAL MATA PELAJARAN BAHASA INGGRIS SMA
by: Kosasih, Engkos
Published: (2014) -
ANALISIS PENULISAN OUTLINE SEBAGAI HASIL BELAJAR METODA PENELITIAN PENDIDIKAN TATA BOGA
by: NURMALASARI, Mala
Published: (2011)