PANDEMI COVID-19 SEBAGAI ALASAN FORCE MAJEURE DALAM KONTRAK KERJASAMA MINYAK & GAS BUMI INDONESIA

The presence of Covid-19 has spread to almost all countries as a disease outbreak or pandemic bringing huge losses. At that time, the inability to carry out the agreed achievements made the parties review the force majeure clause in the contract. The absence of regulations in Indonesia that specific...

Full description

Saved in:
Bibliographic Details
Main Author: Femita Riska Syahvira, (Author)
Format: Book
Published: 2021-02-04.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_10720
042 |a dc 
100 1 0 |a Femita Riska Syahvira, .  |e author 
245 0 0 |a PANDEMI COVID-19 SEBAGAI ALASAN FORCE MAJEURE DALAM KONTRAK KERJASAMA MINYAK & GAS BUMI INDONESIA 
260 |c 2021-02-04. 
500 |a http://repository.upnvj.ac.id/10720/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/10720/11/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/10720/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/10720/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/10720/5/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/10720/6/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/10720/7/Daftar%20Pustaka.pdf 
500 |a http://repository.upnvj.ac.id/10720/8/RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/10720/9/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/10720/12/ARTIKEL%20KI.pdf 
520 |a The presence of Covid-19 has spread to almost all countries as a disease outbreak or pandemic bringing huge losses. At that time, the inability to carry out the agreed achievements made the parties review the force majeure clause in the contract. The absence of regulations in Indonesia that specifically regulate force majeure makes force majeure on Covid-19 have different responses from various parties. This journal aims to analyze the Covid-19 pandemic as a reason for force majeure in Indonesia's oil and gas cooperation contracts. Covid-19 cannot automatically be used as an excuse for force majeure. The consequences and responsibilities that arise afterwards must be taken into account because the oil and gas sector are high risk, high cost & high technology. 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a K Law (General) 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/10720/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/10720/  |z Link Metadata