PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN VACUUM MIXER DENGAN PENERAPAN SIMULASI MONTE CARLO PADA PT. X
PT. X is an industry engaged in the pharmaceutical sector. There are many main production facilities, especially on machines used by this industry, one of which is a Vacuum Mixer machine. The Vacuum Mixer machine was the machine with the highest downtime in 2020 with a total downtime of 38 hours. If...
Saved in:
Main Author: | Muhammad Rizal, (Author) |
---|---|
Format: | Book |
Published: |
2021-07-23.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY
by: Dyah Ayu Pitaloka,
Published: (2022) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PERANCANGAN PERAWATAN MESIN CTCM (CONTINUOUS TANDEM COLD MILL) PT. XYZ DENGAN METODE SIMULASI MONTE CARLO
by: Ahmad Tesa Karyadi,
Published: (2020) -
ANALISIS KEKUATAN KOMPONEN MESIN MIXER DENGAN KAPASITAS PRODUKSI 80 LITER/JAM
by: Asep Sudrajat Gumilar, -
Published: (2014) -
PERBANDINGAN METODE PERAMALAN DAN SIMULASI MONTE CARLO UNTUK MEMINIMALISASI PERSEDIAAN
by: Riva Rachmawati Tsany, -
Published: (2018)