PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN VACUUM MIXER DENGAN PENERAPAN SIMULASI MONTE CARLO PADA PT. X
PT. X is an industry engaged in the pharmaceutical sector. There are many main production facilities, especially on machines used by this industry, one of which is a Vacuum Mixer machine. The Vacuum Mixer machine was the machine with the highest downtime in 2020 with a total downtime of 38 hours. If...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2021-07-23.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!