EVALUASI DAYA ANGKAT FLOATING DOCK JAYAKERTA III SEBAGAI DAMPAK REPARASI AKIBAT KERUSAKAN

Ships have been an option of transportation of goods and people ever since a long time ago. Every ship that is built, of course, needs to be taken care of so that the productivity and safety of the ship is maintained. One of the means to carry out ship maintenance is by using a floating dock. To sup...

Full description

Saved in:
Bibliographic Details
Main Author: Dinda Nursalsabilla, (Author)
Format: Book
Published: 2021-06-21.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_11529
042 |a dc 
100 1 0 |a Dinda Nursalsabilla, .  |e author 
245 0 0 |a EVALUASI DAYA ANGKAT FLOATING DOCK JAYAKERTA III SEBAGAI DAMPAK REPARASI AKIBAT KERUSAKAN 
260 |c 2021-06-21. 
500 |a http://repository.upnvj.ac.id/11529/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/11529/2/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/11529/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/11529/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/11529/5/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/11529/6/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/11529/7/BAB%205.pdf 
500 |a http://repository.upnvj.ac.id/11529/8/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/11529/9/RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/11529/10/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/11529/11/ARTIKEL%20TI.pdf 
520 |a Ships have been an option of transportation of goods and people ever since a long time ago. Every ship that is built, of course, needs to be taken care of so that the productivity and safety of the ship is maintained. One of the means to carry out ship maintenance is by using a floating dock. To support this, of course, it is necessary to take care of the floating dock itself to avoid damage and produce maximum lift. In this study, the author will analyze about evaluating the lifting power of the Jayakerta III floating dock as the impact of repairs due to damage, so that the resulting lift can be seen after repairs are made to be used as a reference for consideration by the shipyard in receiving ships to be repaired. To achieve this goal, an analysis of the lifting capacity of the pontoon or ton lifting capacity is carried out to find out how much lifting power the floating dock currently has. 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a VM Naval architecture. Shipbuilding. Marine engineering 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/11529/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/11529/  |z Link Metadata