Analisis Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Untuk Mengoptimalkan Kinerja Unit Produksi Di PT. X
PT. X is one of the companies in the manufacturing industry engaged in the automotive sector. In carrying out the production process, PT. X sometimes has problems, namely there is often a mismatch in the number of spare parts sent with the number of spare parts written on the purchase order (PO). Th...
Saved in:
Main Author: | Farah Fauzia Imron, Farah (Author) |
---|---|
Format: | Book |
Published: |
2021-07-16.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN TENAGA KERJA DI GROUP PENGADAAN PT XYZ
by: Salsa Febriyanti,
Published: (2023) -
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH TENAGA KERJA DIVISI SERVICE PT. XYZ
by: Teddy Rizki Saputra,
Published: (2023) -
ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH PEGAWAI TIM PLTA X
by: Wahyu Maulana,
Published: (2022) -
WORKLOAD ANALYSIS PADA UNIT PRODUKSI KERTAS GELOMBANG DI PT. X MENGGUNAKAN METODE FULL-TIME EQUIVALENT (FTE)
by: Januardi, I Made Agung
Published: (2023) -
IDENTIFIKASI BEBAN KERJA UNTUK MENENTUKAN JUMLAH TENAGA KERJA PROJECT MANAGEMENT OFFICE WILAYAH DISTRIBUSI 2 DI PT XYZ DENGAN MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT)
by: Nadira Chandra Reyhani,
Published: (2022)