APA (7th ed.) Citation

Leslie Shofira Wijaya. (2021). PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ.

Chicago Style (17th ed.) Citation

Leslie Shofira Wijaya. PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ. 2021.

MLA (9th ed.) Citation

Leslie Shofira Wijaya. PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ. 2021.

Warning: These citations may not always be 100% accurate.