PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
This research is conducted to design a maintenance schedule for chiller machine in PT. XYZ. The purpose of this research is to obtain the right schedule for critical components of chiller machine by using Reliability Centered Maintenance II and Age Replacement Methods to reduce the breakdown, increa...
Saved in:
Main Author: | Leslie Shofira Wijaya, (Author) |
---|---|
Format: | Book |
Published: |
2021-07-15.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
by: Erika Rahmi,
Published: (2022) -
PENJADWALAN PERAWATAN PREVENTIVE MESIN SLOTTING DENGAN MENGGUNAKAN METODE AGE REPLACEMENT DI PT. XYZ
by: Edi Diantoro, -
Published: (2017) -
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY
by: Dyah Ayu Pitaloka,
Published: (2022) -
Perencanaan Sistem Perawatan Mesin Rotary Lobe Pump MelaluiReliability Centered Maintenance (RCM) (Studi Kasus PT. Lombok Gandaria)
by: Kuntadi, Akhnanto, et al.
Published: (2013)