ANALISIS PENERAPAN GREEN MANUFACTURING DALAMPEMBUATAN BOARDING BRIDGE DI PT X
Boarding Bridge is a passenger bridge that is used to cross from the airport terminal to the aircraft door, or vice versa, in the process of making Boarding Bridge, it cannot be separated from the application of Green Manufacturing in order to maintain the creation of a factory environment that can...
Saved in:
Main Author: | Daffa Alandro, (Author) |
---|---|
Format: | Book |
Published: |
2021-12-14.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
SIMULASI ALAT PENDETEKSI BENANG PUTUS DALAMPEMBUATAN KAIN DI PABRIK TEKSTIL SKALA KECIL DENGANMENGGUNAKAN SENSOR INFRA RED
by: Danur Arasyidin, -
Published: (2008) -
Analisis Penerapan Seiri, Seiso, Seiton, Seiketsu, Shitsuke, dan Good Manufacturing Practices Unit Blow Molding PT. X
by: Sabila Putri Ayu Kusuma, et al.
Published: (2024) -
Green Materials and Manufacturing Processes
Published: (2023) -
ANALISIS PROSES PRODUKSI BETON CCSP PT.X MENGGUNAKAN LEAN MANUFACTURING DENGAN PENDEKATAN SIMULASI SISTEM
by: Muhammad Tsany Prasetyo,
Published: (2020) -
ELIMINASI WASTE PADA LINI ASSEMBLY DI PT. X DENGAN PENDEKATAN LEAN MANUFACTURING
by: Diah Arum Puspita,
Published: (2022)